AOPL Logo
AOPL Logo
Explore Solutions

EPBD Building Automation Requirements: Article 13 BACS, Lighting, IEQ Deadlines

hero background
Smart Buildings and IBMS

EPBD Building Automation Requirements: Article 13 BACS, Lighting, IEQ Deadlines

Back to all blogs

Short answer: EPBD building automation requirements sit in Article 13 of Directive (EU) 2024/1275. Non-residential buildings with heating or air conditioning output over 290 kW needed a BACS by 31 December 2024, and over 70 kW need one by 31 December 2029. Lighting controls follow by 31 December 2027 and 2029. IEQ monitoring was due by 29 May 2026. Owners are bound through national law.

Free PDF checklist EPBD BACS Compliance Checklist comes free with this guide. Download now ↓

Applies to: EU (all 27 Member States), with comparisons for the UK, US, Gulf states and India.

Last reviewed: 4 Nov 2026. Asset Online Pvt Ltd (AOPL) supplies and integrates solutions in this area. This is a reading of the official texts, not legal advice.

This post covers each Article 13 clause and date, how to test the 70 kW and 290 kW thresholds, what binds owners today, a clause-to-BMS feature map, other regions, and a free checklist.

Key takeaways

  • Article 13(9) sets two BACS dates for non-residential buildings: over 290 kW by 31 December 2024 and over 70 kW by 31 December 2029 (Directive (EU) 2024/1275).
  • The Commission opened infringement procedures against all 27 Member States on 15 July 2026 for not fully transposing the Directive by 29 May 2026 (Commission news, 15 July 2026).
  • The Commission says heating and cooling outputs are tested separately for the BACS threshold, but added together for the 70 kW inspection threshold (Commission Notice C/2025/6438, Annex 10; Article 23(1)).
  • The Commission says the Article 13(10)(a) to (c) functions could correspond to Class B of EN ISO 52120-1 (Notice C/2025/6438, Annex 10, section 2.5).
  • A building that meets Article 13(10) is exempt from regular HVAC inspections, and since 29 May 2026 that needs IEQ monitoring too (Article 23(7) and Notice C/2025/6438).

What are the EPBD building automation requirements?

A building automation and control system (BACS) is defined in Article 2(7) as all the products, software and engineering services that support energy-efficient, economical and safe operation of technical building systems. In plain terms, that's your BMS, if it can do what Article 13(10) asks. Our building management system guide covers the architecture. Here is what the law says.

Clause Requirement Buildings Date
Art 13(9)(a) BACS installed Non-residential, over 290 kW 31 Dec 2024
Art 13(9)(b) BACS installed Non-residential, over 70 kW 31 Dec 2029
Art 13(10)(a) to (c) Monitor, log, analyse, adjust; benchmark, detect losses, inform; communicate and interoperate Any BACS under 13(9) With the BACS
Art 13(10)(d) Monitor indoor environmental quality Any BACS under 13(9) 29 May 2026
Art 13(12)(a) Automatic lighting controls, zoned, with occupancy detection Non-residential, over 290 kW 31 Dec 2027
Art 13(12)(b) Same Non-residential, over 70 kW 31 Dec 2029
Art 13(5) Devices to monitor and regulate indoor air quality Non-residential zero-emission buildings; existing non-residential at major renovation Transposition, 29 May 2026
Art 13(11) Continuous electronic monitoring, controls, response to external signals New residential and major residential renovations 29 May 2026

Every BACS and lighting duty carries a qualifier. It applies "where technically and economically feasible" (Art 13(9) and 13(12)).

Timeline of EPBD Article 13 dates: BACS over 290 kW by 31 Dec 2024, IEQ monitoring and transposition by 29 May 2026, formal notice to all 27 states 15 Jul 2026, Commission SRI act due 30 Jun 2027, lighting controls over 290 kW by 31 Dec 2027, BACS and lighting over 70 kW by 31 Dec 2029
Article 13 dates as of 4 Nov 2026. Sources: Directive (EU) 2024/1275 Art 13(9), 13(10)(d), 13(12), 15(2), 35(1); Commission news, 15 Jul 2026.

The 31 December 2024 date isn't really new. Directive (EU) 2018/844 already required BACS over 290 kW "by 2025", and states had to transpose that by 10 March 2020. The Commission says the recast simply states the date more clearly (Notice C/2025/6438, Annex 10, section 2.5).

Does the 70 kW or 290 kW threshold apply to your building?

Effective rated output is the maximum calorific output the manufacturer specifies and guarantees for continuous operation (Art 2(49)). Use this table to find your band.

Step Question If yes If no
1 Is the building non-residential? Go to 2 Article 13(11) applies instead
2 Is there a heating, air conditioning or combined ventilation system? Go to 3 Check national law; Article 13(9) has nothing to measure
3 Leave out systems for non-EPB uses, such as process hot water or storage refrigeration. Is heating or cooling output over 290 kW? BACS date has passed. IEQ and lighting dates apply Go to 4
4 Is heating or cooling output over 70 kW? BACS and lighting by 31 Dec 2029 No Article 13(9) or 13(12) duty
5 Is it not technically or economically feasible? Record why, using the national test The duty stands

A trap in the arithmetic. The Commission says BACS rules apply if "either the heating or cooling generator rated outputs (separately)" reach the threshold. National guides don't all read it that way.

Take an office with 200 kW of heating and 200 kW of cooling. Under the Commission's reading, and under Flanders' published guidance, neither side passes 290 kW. So the building falls in the 70 kW band, with a 2029 date. Ireland's SEAI assessment guide works out a total across heating, ventilation and air conditioning. Its worked example adds a boiler and AC units to reach 350 kW. On that method our office totals 400 kW, and the Irish date of 31 December 2025 has already passed. So check your national guide before you settle on a band.

Inspections work differently again. Article 23(1) bases the 70 kW inspection threshold on the sum of heat and cooling generators.

Requirements by output band: over 290 kW needs BACS by 31 Dec 2024, IEQ monitoring by 29 May 2026, lighting by 31 Dec 2027 and inspections every 3 years; over 70 kW needs BACS and lighting by 31 Dec 2029 and inspections every 5 years; 70 kW or less has no such duty
What each output band must do. Sources: Directive (EU) 2024/1275 Art 13(9), 13(10), 13(12), 23; Commission Notice C/2025/6438, Annex 10. IEQ timing in the middle band is our reading.

What binds building owners today if countries haven't transposed the EPBD?

The Directive is addressed to Member States (Art 38). It tells them to "lay down requirements". So your duty comes from your national law, and here's where that stands as of 4 November 2026.

  • 290 kW BACS: this should already be in national law, since the 2018 rule had to be transposed by March 2020. The Commission says those provisions "should therefore already have been transposed". The old Directive was repealed from 30 May 2026 (Art 36), but a repeal at EU level doesn't remove national rules.
  • IEQ, lighting and 70 kW: these are new, and Article 35(1) set 29 May 2026 for transposition. On 15 July 2026 the Commission sent formal notice to all 27 states, with two months to respond.
  • What happened next: the Commission's 1 October 2026 energy package sent reasoned opinions to nine states over draft National Building Renovation Plans. We found no reasoned opinion yet on Directive-wide transposition, as of 4 November 2026.
  • Amendments: the Publications Office record shows one amending act, Delegated Regulation (EU) 2026/52, and it changes Annex III on life-cycle global warming potential. We found nothing that changes Article 13, and no proposal to amend the Directive by name.
  • Penalties: the Directive sets no figure. Article 34 leaves them to each state, and they must be effective, proportionate and dissuasive.

The Notice is guidance only. Its own text says "only the text of the EU act itself has legal force". National law can also differ from it, as these four examples show.

Jurisdiction Threshold and date (existing buildings) Feasibility or exemption Who holds the duty
France (ministry guide, Jan 2026) Over 290 kW by 1 Jan 2025; over 70 kW by 1 Jan 2030 Exempt if a study shows payback over 10 years See guide
Germany (GModG s.56, amended 23 Jul 2026) Over 70 kW by 31 Dec 2029; lighting same date; IEQ in the required functions Not technically possible or economically unreasonable. Systems fitted in the 3 years before 1 Jan 2027 get up to 10 years Owner, for the s.56(4) retrofit
Ireland (SEAI, S.I. 393 of 2021) Over 290 kW by 31 Dec 2025 See technical guidance Building owner
Flanders (Belgium) Over 290 kW by 31 Dec 2025; 70 kW by 31 Dec 2029 Not technically, functionally or economically feasible; single-service buildings exempt Owner or rights holder; can fall on the tenant in shell leases

We read section 56 as it stood on 4 November 2026. It has no separate 2027 lighting step or existing-building 290 kW step, so German owners should ask their adviser how the older duty carries over.

What must a BACS do under Article 13(10)?

Article 13(10) lists capabilities, not products. It names no protocol or brand. The table below is our own mapping of each clause to BMS features, with a test you can run at handover. The clause wording is the law. The features and tests are our suggestion.

Art 13(10) words BMS feature Handover test (our suggestion)
(a) Continuously monitoring Live points and sub-metering by main energy carrier and system Show one week of data with no unexplained gaps
(a) Logging Historian with set retention and export Export 12 months in an open file format
(a) Analysing Energy dashboards, by area and system Produce a monthly use report by system
(a) Allowing for adjusting Writable set points and schedules Change a schedule, then see the energy trend respond
(b) Benchmarking Baseline against past use or a peer building Show the baseline and how it was set
(b) Detecting losses Fault detection rules Force a fault, such as a stuck valve, and see it flagged
(b) Informing the responsible person Alerts and reports to a named person Confirm who receives the alert and what it recommends
(c) Communicating with connected systems BACnet, Modbus, KNX or DALI gateways, as the site needs Read and command each system from the front end
(c) Interoperable across makers Open protocols, documented points list, client-owned configuration Add a device from another maker, and have a third party read the data
(d) Monitoring IEQ Temperature, relative humidity, CO2 and, where relevant, PM2.5 sensors Trend each sensor against the occupied zone it serves

Our building energy management system guide goes deeper on metering and fault detection.

Scope. The Commission says these capabilities must cover at least heating, air conditioning and combined ventilation systems. A sub-system can meet a requirement if its components exchange data and interoperate. So CO2 sensing inside a ventilation unit can count, if it talks to the main BACS. The rule on interoperability also applies when you replace individual components.

The ISO 52120-1 link. The Commission says the (a) to (c) capabilities "could correspond to B-class BACS" under EN 52120-1, and that IEQ functions should at least conform to Class B. Assessment may use that standard. A footnote adds that individual Class B items may be omitted if they aren't feasible and that's documented. We haven't reproduced the standard's tables here, because it is a paid document. If you're on an older system, our BMS retrofit guide explains how to integrate before you replace.

What do EPBD lighting controls need by 2027?

Article 13(12) wants automatic lighting controls that are "suitably zoned and capable of occupancy detection". The first date is 31 December 2027 for buildings over 290 kW. That's the HVAC output again, not the lighting load. The same buildings fall under the BACS clause, as Annex 10, section 2.8 confirms.

The Commission's Table 9 gives example requirements:

  • Occupancy detection: designed to Table 5, ref. 5.1, level 2 of EN ISO 52120-1.
  • Zoning: rooms grouped by occupancy pattern, ideally lined up with BACS zones.
  • Daylight control: optional.
  • Scope: "built-in lighting" only, so equipment installed to meet design lighting specifications.

The system can be stand-alone or part of a central BMS. The Commission points out that occupancy data can also drive the indoor climate, so integration helps both. It also warns you to count the sensors' own standby power in your feasibility case. See our comparison of DALI, KNX and wireless lighting control and our guide to occupancy sensors.

What does IEQ monitoring mean under Article 13(10)(d)?

Article 2(66) defines indoor environmental quality as an assessment of indoor conditions that influence occupants' health and wellbeing, such as temperature, humidity, ventilation rate and contaminants. The Directive doesn't list what to measure. The Commission recommends indoor temperature, relative humidity, CO2 and, where relevant, PM2.5. It describes the monitoring as continuous measuring in spaces designed for human occupancy.

There is a useful carve-out. In existing buildings, where temperature is already used as a proxy and the kit can interact with ventilation to reach the set rates, the Commission says an upgrade may not be feasible until a major renovation. That's guidance, so check that your national law allows it, and record your reasoning.

Our reading for the 70 kW band: paragraph (d) sits in the list of capabilities every BACS must have. So a system installed for the 2029 date should include IEQ monitoring from day one. Don't buy a new system without it.

What else does Article 13 connect to?

  • Inspections (Art 23): systems over 70 kW need inspection at least every 5 years, and over 290 kW at least every 3. Buildings that meet Article 13(10) are exempt under Article 23(7). This saving is a real part of the BACS case.
  • Smart readiness (Art 15): the Commission must adopt a delegated act by 30 June 2027 applying the smart readiness scheme to non-residential buildings over 290 kW.
  • Data access (Art 16): owners, tenants and managers get direct access to building systems' data, including BACS data, at no added cost for that access.
  • EV charging (Art 14): by 1 January 2027, non-residential buildings with more than 20 parking spaces need a set level of recharging points or ducting. Article 14(1) also calls for cabling that can support load management, where feasible. Plan that interface with the BMS.

How do EU rules compare with the UK, US, Gulf and India?

The EU sets a date for existing buildings. Few others do. Most codes bite at new build or replacement, or they regulate results instead of controls.

Regulation by region

Region Rule Trigger What it asks of controls Status
EU Directive (EU) 2024/1275, Art 13 Over 290 kW and over 70 kW, existing and new Functions in 13(10), plus lighting Dates above; via national law
UK (England) Approved Document L, Vol 2, paras 6.66 to 6.73 Over 180 kW: new buildings; existing when a BACS is replaced or installed Near-identical functions; no IEQ item; BS EN 15232 Class A "would meet" them In effect since 15 Jun 2022
UK (England) MEES, per Mayer Brown, 23 Jun 2026 Rented commercial over 1,000 m² No controls clause; EPC B from 2031 Secondary legislation pending
US (New York City) Local Law 97 25,000 sq ft or larger (about 2,323 m²) Emissions limits; no controls clause. USD 268 per tCO2e over the limit In force
US (Washington State) Clean Buildings Performance Standard Tier 1: over 50,000 sq ft (about 4,645 m²) Benchmarking, energy management plan, O&M programme 1 Jun 2026 to 1 Jun 2028, by size
Gulf (Dubai) Al Sa'fat, 2nd edition, s.503.05 New buildings: cooling load of 1 MW or 5,000 m² gross floor area Central control and monitoring system; Dubai Building Code H.4.14.2 applies Current edition, Jan 2023
Gulf (Saudi Arabia) Saudi Building Code, incl. SBC 1001 (2024) New buildings We couldn't open the controls clauses, so we make no claim In force per IEA
India ECSBC 2024, BEE Connected load of 100 kW or contract demand of 120 kVA Six mandatory HVAC controls (6.2.3), sub-metering (Tables 8.2, 8.3), occupancy sensors (7.2.2) Depends on state adoption

We found no national US rule like Article 13, but we didn't review every state code. India's position is covered in our ECSBC 2024 guide.

If you export from India: what should MEP and SI firms do?

The EPBD doesn't apply to an Indian company as such. It reaches you through the contract, if you design or integrate systems for a building in the EU. The owner's national duty then shows up as your scope.

So, for Indian MEP consultants and system integrators bidding on EU sites:

  • Ask which national law applies. Don't price to the Directive's dates alone. The France, Germany and Ireland examples above show why.
  • Write the Article 13(10) items into the deliverables. Use the mapping table above as acceptance tests.
  • Close the gaps against ECSBC habits. ECSBC's half-hourly metering and RS-485 Modbus port (section 8) are a good base. But its baseline IEQ rules (11.2) cover filters and design ventilation rates. Sensors that monitor ventilation appear only in the voluntary tiers (11.3.1), and we found no general duty to benchmark or detect faults.
  • Keep the documents. Rated outputs, the threshold calculation and any feasibility study will decide the owner's position later.

A note on "GCC". In this post, Gulf means the Gulf Cooperation Council states. Global capability centres in India are a separate case. The EPBD doesn't apply to a building in Bengaluru or Hyderabad. If a European parent asks for "EPBD-grade" controls, that's a company standard, not a legal duty. In our view, Article 13(10) is still a clear way to write that spec, and tenants should check that the landlord's BMS gives them their data. See also our note on securing BMS networks, because more integration means more exposure.

For a budget, our BMS cost guide gives Indian ranges. The Directive sets no cost figure, and we found no official one, so we've left out EU prices here.

Questions to ask your BMS vendor

  1. Which national law and which date did you price to?
  2. Which heating and cooling outputs did you use, and were they added or tested separately?
  3. Which Article 13(10) functions are in the base price, and which are options?
  4. Can you show an EN ISO 52120-1 Class B assessment, with any omitted items listed?
  5. Who owns the configuration, points list and logged data after handover?
  6. Can a third party read the data and add devices without paying you?
  7. Which sensors deliver IEQ monitoring, in which zones?
  8. Does the lighting scope meet level 2 occupancy detection, with zones matched to BACS zones?
  9. Does the delivered system qualify for the Article 23(7) inspection exemption in this country?

Free download: EPBD BACS compliance checklist

Preview of the first page of the free EPBD BACS compliance checklist PDF
Free PDF checklist
EPBD BACS Compliance Checklist
Two A4 pages for owners, facility heads and integrators. Find your output band, then tick through BACS functions, IEQ monitoring, lighting controls and records, each with its Article 13 or Commission guidance reference.
  • Bands at 70 kW and 290 kW with EU dates
  • 30 checks with clause references
  • Dated worksheet for your national law and exemptions
Download the free PDF ↓
PDF · 2 pages · Status as of 4 Nov 2026 · No sign-up

FAQs

Is BACS mandatory in the EU? Yes, where technically and economically feasible, for non-residential buildings over 290 kW since 31 December 2024 and over 70 kW by 31 December 2029 (Article 13(9)). The duty reaches owners through national law.

Has the 2029 BACS deadline for 70 kW buildings changed? Not in the Directive, as of 4 November 2026. National dates can differ slightly: France uses 1 January 2030, per its January 2026 ministry guide.

Do I add heating and cooling to test the 290 kW threshold? The Commission says no, the outputs are tested separately (Notice C/2025/6438, Annex 10). Ireland's SEAI guide totals them, so check your national guide.

Does a BMS automatically meet EPBD Article 13? No. It must monitor, log, analyse and adjust, benchmark, detect losses, inform the responsible person, interoperate and monitor IEQ. Older systems may need upgrades, so assess yours against Class B of EN ISO 52120-1.

What happens if my country hasn't transposed the EPBD yet? The older 290 kW duty should already be in national law. New duties reach you once national law adopts them, but the EU dates haven't moved, so plan to them. Take local legal advice on your position.

Are penalties set in the Directive? No. Article 34 requires each state to set penalties that are effective, proportionate and dissuasive.

Planning a BACS assessment or an upgrade? See our smart building solutions or talk to Asset Online Pvt Ltd (AOPL).

Sources