Short answer: India's Energy Conservation and Sustainable Building Code (ECSBC 2024) replaced ECBC 2017 in September 2024. It applies to new commercial and office buildings with a connected load of 100 kW or more, or a contract demand of 120 kVA or more, once your state notifies it. Baseline compliance is mandatory; ECSBC+ and Super ECSBC are voluntary higher tiers. Beyond the envelope, HVAC and lighting rules, it asks for half-hourly metering, sub-metering of services and space for rooftop solar.

This guide explains who the code applies to, what changed from ECBC, what it asks for in metering and controls, where states stand, and what owners and developers should do now.

What is ECSBC 2024?

The Bureau of Energy Efficiency (BEE), under the Ministry of Power, first launched the Energy Conservation Building Code in May 2007 as a voluntary measure, and updated it in 2017 (BEE, ECSBC Commercial). In September 2024 the Ministry upgraded it to the Energy Conservation and Sustainability Building Code, adding water conservation, waste management and indoor air quality (Ministry of Power achievements note, PIB, June 2025).

BEE's own foreword says the energy thresholds were slightly tightened from ECBC 2017, and the biggest change is the addition of sustainability (BEE, ECSBC 2024). Homes are covered by a separate residential code, Eco Niwas Samhita 2024.

The legal basis is the Energy Conservation (Amendment) Act, 2022. It renamed the code the "energy conservation and sustainable building code" and defined it to cover energy efficiency, renewable energy and other green building requirements (Energy Conservation (Amendment) Act, 2022, via PRS India).

Which buildings must comply?

Test ECSBC 2024 rule
Load Connected load of 100 kW or more, or contract demand of 120 kVA or more
Use Commercial or office buildings (hotels, hospitals, offices, malls, schools and others)
Residential Not in this code; covered by Eco Niwas Samhita 2024
New or existing The PIB note says the codes apply to new buildings
Systems covered Envelope, HVAC, service hot water, lighting, electrical power and motors, renewables, site, water, waste
Not covered Plug loads and process energy for manufacturing, unless the code says otherwise

Two points from the 2022 Amendment Act matter to developers. First, its definition of "building" now includes residential use, not just commercial and office. Second, a state government may set a lower connected load or contract demand than 100 kW / 120 kVA. So check your state's rules; your project may be covered even below the national threshold.

Is ECSBC mandatory in my state?

The code is national, but it becomes enforceable only when a state notifies it and builds it into its building bye-laws and approval process. The Ministry of Power's June 2025 note gave this status:

Indicator Status (PIB, June 2025)
States and UTs that have notified ECBC 26
States that have included it in building bye-laws 13
Buildings approved as ECBC-compliant 3,500+
First state to notify ECSBC Kerala

Notification and enforcement are different things. A state may have notified the code but not yet added it to the approval checklist of its urban local bodies. Ask your architect to confirm with the State Designated Agency for energy conservation.

ECSBC, ECSBC+ and Super ECSBC: what's the difference?

The code sets three performance levels. Only the first is mandatory; the other two are voluntary benchmarks that BEE says may become the baseline in future updates.

Bar chart of energy savings versus a conventional building: about 25% for ECBC compliant, about 35% for ECBC+, and 50% or more for Super ECBC
BEE's figures for the three ECBC 2017 levels.

Under ECBC 2017, BEE put the savings at roughly 25% for a compliant building, 35% for ECBC+ and 50% or more for Super ECBC, against a conventional building. The PIB note says ECSBC-compliant buildings can save a further 18%.

If you use the whole-building performance route, ECSBC+ and Super ECSBC must beat the ECSBC baseline by a minimum percentage that varies by building type and climate:

Grouped bar chart of minimum extra energy savings over the ECSBC baseline in composite climate: regular office 14% and 22%, 24-hour office 12% and 24%, hospital 15% and 23%, hotel 9% and 19%, shopping mall 14% and 26%, supermarket 19% and 30%, schools 23% and 34%
ECSBC 2024, Table 12.7 (composite climate).

For a regular-use office in a composite climate (most of north India), that's 14% better than baseline for ECSBC+, and 22% for Super ECSBC.

What does ECSBC say about metering and energy management?

This is the part that turns into hardware and software, and where many projects fall short at handover. Section 8.2.5 of ECSBC 2024 sets the metering rules:

Where What the meter must record
Building mains kWh, kVARh, kVAh, demand (kW/kVA) and THD (voltage and current) on a half-hourly basis; current in each phase and neutral, and voltages
Services of 1,000 kVA and above Demand (kVA), energy (kWh) and power factor half-hourly, plus current, voltage and THD
Services of 65 to 1,000 kVA Demand, energy and power factor (or kVARh) half-hourly
Services under 65 kVA Energy (kWh) hourly
Building services and specific building types Sub-metering as set out in Tables 8.2 and 8.3

The higher tiers add automated controls (section 6.3.9 and 6.3.10):

  • ECSBC+: automated zone temperature control, AHU fan energy optimisation and secondary pump energy optimisation.
  • Super ECSBC: zone temperature control, control of fenestration, louvres or blinds, occupancy control, and chiller plant control.

In practice, those controls and that metering need a building management system to collect the data and act on it. Hot water heat pumps in ECSBC+ and Super ECSBC buildings, for instance, must give data to the building's central BMS. Our guide to smart energy meters and sub-metering covers meter selection, and BMS system cost in India covers the budget.

What else is new in ECSBC 2024?

  • Renewable energy zone. Every building must keep a dedicated, shade-free Renewable Energy Generating Zone of at least 50% of roof area, or the area needed to generate 4% of peak demand or connected load, whichever is less (section 8.2.11).
  • Sustainability chapters. Site planning (topsoil and tree preservation), water efficiency, and waste management now sit alongside energy.
  • Water fixtures. ECSBC+ and Super ECSBC buildings must use rated sanitaryware and fittings under IS 17650.
  • Commissioning. An appendix sets a commissioning process for buildings over 5,000 m² of built-up area. That section is voluntary, but it's good practice.

What should owners and developers do in the next 12 months?

  1. Confirm your state's position. Has it notified ECSBC 2024, or still ECBC 2017? Is it in the bye-laws? Has it lowered the load threshold?
  2. Decide the tier early. Choosing ECSBC+ after design freeze is expensive. Decide at concept stage, with an energy model.
  3. Write the metering into the BOQ. List every meter, its parameters and its logging interval from section 8.2.5 and Tables 8.2 and 8.3.
  4. Specify the BMS against the controls clauses. If you're targeting ECSBC+, the BMS must do AHU fan and secondary pump optimisation, not just display values.
  5. Reserve the roof. Mark the Renewable Energy Generating Zone on the roof plan before services take the space.
  6. Plan for operations. The savings only show up if someone reads the meter data. Set up monthly energy reports from day one.

Questions to ask your consultant or BMS vendor

  • Which version of the code (ECBC 2017 or ECSBC 2024) has our state notified, and is it in the building bye-laws?
  • Which compliance method are we using: the integrative or the standardised method?
  • Does our meter schedule meet section 8.2.5 and Tables 8.2 and 8.3?
  • Can the BMS log half-hourly data from every meter and export it?
  • Which ECSBC+ or Super ECSBC control sequences will the BMS run, and how will we test them at commissioning?
  • Who will produce the compliance forms and documents the approving authority needs?

FAQs

Is ECSBC 2024 mandatory? Baseline ECSBC compliance is mandatory where the state has notified the code. ECSBC+ and Super ECSBC are voluntary.

What is the connected load threshold for ECSBC? 100 kW connected load or 120 kVA contract demand. A state may set a lower threshold under the 2022 amendment.

Does ECSBC apply to residential buildings? No. Homes are covered by Eco Niwas Samhita 2024, the residential part of the code.

Does ECSBC require a BMS? The code doesn't name a BMS for the baseline, but its metering and the automated controls for ECSBC+ and Super ECSBC are hard to deliver without one.

What is the difference between ECBC and ECSBC? ECSBC 2024 replaced ECBC 2017. It tightens energy thresholds slightly and adds sustainability: site, water, waste and indoor air quality.

Planning metering and controls for a code-compliant building? See our smart building solutions, or talk to us.

Sources