Short answer: EPBD transposition status as of 7 November 2026: all 27 EU countries face the infringement procedure opened in July, with no closure announced. The Commission sent formal notices to all 27 Member States on 15 July 2026 for not fully transposing Directive (EU) 2024/1275. EUR-Lex lists measures from 20 states against the 29 May 2026 deadline, measures for the boiler-subsidy article only from 5, and none from Denmark or Malta. We found no reasoned opinion on transposition yet.
Applies to: EU (all 27 Member States), with a comparison for the UK and India.
Last reviewed: 7 Nov 2026. We review this tracker every quarter, and sooner when the Commission takes the next step. Dated changes are in the change log at the bottom. Asset Online Pvt Ltd (AOPL) supplies and integrates solutions in this area. This page explains what official sources show. It isn't legal advice.
This post covers a 27-country status table built from official EU data, what each status means, what transposition changes for building automation, where enforcement stands, what owners should do now, and a free Excel tracker.
Key takeaways
- The Commission opened infringement procedures against all 27 Member States on 15 July 2026 for failing to fully transpose the recast EPBD by 29 May 2026 (Commission, DG Energy, 15 July 2026).
- On 7 November 2026, EUR-Lex listed 478 national measures for Directive (EU) 2024/1275, but none at all from Denmark or Malta (EUR-Lex national transposition measures).
- 13 states notified a measure for the main deadline on or after the 15 July formal notice, the latest being Austria on 5 November 2026 (EUR-Lex data, our count).
- Article 13(9)(b) still requires BACS in non-residential buildings over 70 kW by 31 December 2029, and Article 13(12)(a) requires lighting controls over 290 kW by 31 December 2027 (Directive (EU) 2024/1275).
- Nine states received a separate reasoned opinion on 1 October 2026 for not submitting draft National Building Renovation Plans (Commission, 1 October 2026).
What is the EPBD transposition status in each EU country?
Transposition means a Member State writes a directive into its own law. The EPBD is addressed to Member States (Article 38), so owners are bound by national law, not by the directive itself. Article 35(1) set 29 May 2026 for most of the directive and 1 January 2025 for Article 17(15), the ban on subsidies for stand-alone fossil fuel boilers.
The table below is our synthesis of two official datasets. Columns marked [N] come from the EUR-Lex list of national transposition measures for CELEX 32024L1275. Columns marked [C] come from the Commission's infringement announcements. FN means letter of formal notice. RO means reasoned opinion. NBRP is the National Building Renovation Plan.
| Country | Measures listed: main deadline / Art 17(15) [N] | Latest main-deadline notification [N] | Example measure named [N] | Infringement steps [C] |
|---|---|---|---|---|
| Austria | 48 / 11 | 5 Nov 2026 | Burgenland building regulation amendment of 22 Oct 2026; Upper Austria building law amendment 2026 | FN 15 Jul 2026; NBRP FN Mar 2026 |
| Belgium | 12 / 7 | 20 Aug 2026 | Brussels-Capital EPB orders on heating and air-conditioning systems; Flemish energy and climate decree of 27 Feb 2026 | FN 15 Jul 2026; NBRP RO 1 Oct 2026 |
| Bulgaria | 35 / 1 | 2 Jun 2026 | Ordinance RD-02-20-3 of 2022 on technical requirements for buildings' energy performance | FN 15 Jul 2026 |
| Croatia | 1 / 0 | 29 Dec 2025 | Act on Energy Efficiency in Buildings | FN 15 Jul 2026 |
| Cyprus | 1 / 1 | 19 Mar 2026 | Streets and Buildings (Mechanical and Electrical Installations) (Amending) Regulations 2026 | FN 15 Jul 2026; NBRP FN Mar 2026 |
| Czechia | 42 / 6 | 29 Jul 2026 | Decree 97/2026 Coll. amending Decree 146/2024 Coll. on construction requirements | FN 15 Jul 2026; NBRP RO 1 Oct 2026 |
| Denmark | 0 / 0 | Not found in official sources as of 7 Nov 2026 | Not found in official sources as of 7 Nov 2026 | FN 15 Jul 2026 |
| Estonia | 0 / 6 | None for main deadline | Renovation grant conditions (Art 17(15) only) | FN 15 Jul 2026; NBRP FN Mar 2026; Art 17(15) FN Nov 2025 |
| Finland | 22 / 0 | 21 Oct 2026 | Act 733/2020 on fitting buildings with EV charging and automation and control systems; Building Act 751/2023 | FN 15 Jul 2026 |
| France | 2 / 18 | 23 Mar 2026 | Decree 2025-1343 of 26 Dec 2025 changing the dates of the BACS obligations; Decree 2026-16 | FN 15 Jul 2026; NBRP FN Mar 2026 |
| Germany | 1 / 1 | 13 Jan 2025 | Federal funding guideline BEG EM (see note below on GModG) | FN 15 Jul 2026; NBRP FN Mar 2026 |
| Greece | 0 / 1 | None for main deadline | Biomethane and hydrogen law (Art 17(15) only) | FN 15 Jul 2026; NBRP FN Mar 2026 |
| Hungary | 49 / 4 | 1 Oct 2026 | Government Decree 176/2008 on energy performance certificates, and building-sector decrees | FN 15 Jul 2026; NBRP RO 1 Oct 2026; Art 17(15) FN Nov 2025 |
| Ireland | 4 / 2 | 15 Sep 2026 | S.I. 168 of 2026 and S.I. 195 of 2026, EU (Energy Performance of Buildings) Regulations 2026 | FN 15 Jul 2026; NBRP RO 1 Oct 2026 |
| Italy | 0 / 1 | None for main deadline | Budget Law 207/2024, Art 1(55) (Art 17(15) only) | FN 15 Jul 2026; NBRP RO 1 Oct 2026; Art 17(15) FN Nov 2025 |
| Latvia | 52 / 7 | 4 Sep 2026 | Cabinet Regulation 497 of 25 Aug 2026 on minimum energy efficiency of buildings in use | FN 15 Jul 2026; NBRP FN Mar 2026 |
| Lithuania | 63 / 4 | 23 Sep 2026 | Environment Minister order D1-680 on energy performance certification | FN 15 Jul 2026 |
| Luxembourg | 9 / 3 | 17 Sep 2026 | Grand-Ducal Regulation of 9 June 2021 on the energy performance of buildings | FN 15 Jul 2026; NBRP RO 1 Oct 2026 |
| Malta | 0 / 0 | Not found in official sources as of 7 Nov 2026 | Not found in official sources as of 7 Nov 2026 | FN 15 Jul 2026; NBRP RO 1 Oct 2026 |
| Netherlands | 3 / 0 | 27 May 2026 | Decree of 21 Apr 2026 amending the Bbl, first tranche of implementing the directive | FN 15 Jul 2026; NBRP FN Mar 2026 |
| Poland | 32 / 3 | 17 Sep 2026 | Regulations on energy performance methodology and technical conditions for buildings | FN 15 Jul 2026; NBRP RO 1 Oct 2026 |
| Portugal | 0 / 2 | None for main deadline | Decree-Law 11/2025, partial transposition | FN 15 Jul 2026; NBRP FN Mar 2026 |
| Romania | 0 / 1 | None for main deadline | Government Ordinance 16/2025 transposing Art 17(15) | FN 15 Jul 2026 |
| Slovakia | 2 / 4 | 16 Oct 2026 | Act 246/2026 amending Act 555/2005 on the energy performance of buildings | FN 15 Jul 2026; NBRP RO 1 Oct 2026 |
| Slovenia | 9 / 2 | 12 Jun 2026 | Rules on efficient use of energy in buildings; Energy Act (EZ-2) | FN 15 Jul 2026 |
| Spain | 8 / 0 | 15 Sep 2026 | Royal Decree 1027/2007, Regulation on Thermal Installations in Buildings (RITE) | FN 15 Jul 2026 |
| Sweden | 17 / 0 | 8 Sep 2026 | Boverket rules BFS 2026:9 on energy management in buildings | FN 15 Jul 2026; NBRP FN Mar 2026 |
Sources: [N] EUR-Lex national transposition measures for Directive (EU) 2024/1275, with notification dates per deadline from the Publications Office SPARQL endpoint, both read 7 Nov 2026. [C] Commission announcements of 15 July 2026, 11 March 2026, 1 October 2026 and November 2025. Measure names are our short English renderings of the official titles. One measure can be linked to both deadlines.
Germany, a note. Only one German measure is listed, a federal funding guideline notified in January 2025. Yet the Gebäudemodernisierungsgesetz (GModG), last amended on 23 July 2026, already has a section 56 on building automation. It requires BACS in non-residential buildings over 70 kW by 31 December 2029, and the system must monitor indoor climate quality. Its own footnote lists the 2010 and 2018 EPBD texts but not Directive (EU) 2024/1275. So German owners face real BACS rules, even though the EU list looks thin.
How did we build this tracker, and what does "notified" mean?
We pulled every national measure linked to CELEX 32024L1275 from the Publications Office data on 7 November 2026. Each link carries the deadline it answers and the date it was notified. The 478 measures, and each country's count, match the EUR-Lex page read the same morning.
Then we sorted the 27 states into four groups:
| Group | States | Who |
|---|---|---|
| Main-deadline measures notified, latest on or after the 15 July formal notice | 13 | Austria, Belgium, Czechia, Finland, Hungary, Ireland, Latvia, Lithuania, Luxembourg, Poland, Slovakia, Spain, Sweden |
| Main-deadline measures notified, none since 15 July | 7 | Bulgaria, Croatia, Cyprus, France, Germany, Netherlands, Slovenia |
| Only Article 17(15) measures notified | 5 | Estonia, Greece, Italy, Portugal, Romania |
| No measures listed | 2 | Denmark, Malta |
Read the counts with care. EUR-Lex itself says the Member States "bear sole responsibility" for this information, and that it doesn't prejudge the Commission's check of completeness. Many listed measures are older laws re-notified. Spain lists its 2007 thermal installations regulation, for example. A state with 60 measures may still have gaps, and a state with 3 may have covered a lot. The Netherlands describes its April 2026 decree as the first tranche of implementation, so more is coming.
The useful signal is movement. Thirteen states sent new notifications after the formal notice. Seven haven't added anything for the main deadline since. Seven have nothing at all for it.
What does EPBD transposition change for building automation?
Article 13 is the building automation article. These are the dates in the text, which haven't been amended. The only amending act we found in the Publications Office record is Delegated Regulation (EU) 2026/52, which changes Annex III, not Article 13.
| Clause | What national law must require | Date |
|---|---|---|
| Art 13(9)(a) | BACS in non-residential buildings with heating, air conditioning or combined ventilation over 290 kW | 31 Dec 2024 |
| Art 13(9)(b) | The same, over 70 kW | 31 Dec 2029 |
| Art 13(10)(a) to (c) | BACS must monitor, log, analyse and adjust energy use; benchmark and detect efficiency losses; interoperate across makers | With the BACS |
| Art 13(10)(d) | BACS must monitor indoor environmental quality | 29 May 2026 |
| Art 13(11) | New and majorly renovated homes: electronic monitoring, controls, response to external signals | From 29 May 2026 |
| Art 13(12)(a) and (b) | Automatic lighting controls, zoned and capable of occupancy detection: over 290 kW, then over 70 kW | 31 Dec 2027; 31 Dec 2029 |
Each BACS and lighting duty applies "where technically and economically feasible". Our Article 13 explainer works through the thresholds and the BMS features clause by clause.
Here's why the transposition gap matters less than it looks for the 290 kW band. That duty isn't new. Directive (EU) 2018/844 already required BACS over 290 kW "by 2025", and states had to transpose it by 10 March 2020. So it should already sit in national law. What transposition adds is the IEQ function, the 70 kW band, the lighting dates and the residential rules. Those are the parts that are late.
National dates can also shift within the directive's frame. France's Decree 2025-1343, which France has notified, changed the application dates of its BACS obligations. Check the national text for your exact date.
Where has the Commission got to with enforcement?
The infringement procedure has set steps under Articles 258 and 260 of the Treaty on the Functioning of the EU (TFEU):
- Letter of formal notice. The state gets two months to reply. All 27 got one on 15 July 2026, so the window closed in mid-September by our count.
- Reasoned opinion. The Commission sets out what is still missing and gives another deadline (TFEU Art 258). We found none on EPBD transposition in the September or October 2026 packages.
- Referral to the Court of Justice. For failure to notify transposition, Article 260(3) lets the Commission ask the Court for a lump sum or penalty payment at the same time.
Two side procedures already run under the same directive. Nineteen states got formal notice in March 2026 for missing the 31 December 2025 deadline for draft renovation plans. On 1 October 2026, nine of them got reasoned opinions: Belgium, Czechia, Ireland, Italy, Luxembourg, Hungary, Malta, Poland and Slovakia. Separately, Estonia, Italy and Hungary got formal notice in November 2025 over Article 17(15).
How fast could the next step come? A useful precedent is the recast Energy Efficiency Directive. Formal notices went to 26 states in November 2025, and reasoned opinions followed on 1 October 2026 (Commission, 1 October 2026). That is a precedent, not a forecast. Expect the Commission's monthly packages to show the next EPBD step, and we'll log it here.
What should building owners do whether or not their country has transposed?
Don't wait for a reasoned opinion. The EU dates in Article 13 haven't moved, and the national rules arriving now copy them closely. Germany's GModG is an example: the same 70 kW and 2029 figures.
If your country has notified new measures (the 13 states that moved after July):
- Get the national text named in the table and check its BACS article, threshold method and date.
- Look for a feasibility test and how it must be documented.
- Check whether IEQ monitoring is now spelled out, and from when.
If your country hasn't notified, or notified only old laws:
- Comply with the 290 kW duty anyway. It came from the 2018 directive and should already be national law.
- Plan new BACS buys to meet all of Article 13(10), IEQ monitoring included. A system bought in 2027 without it may need rework when the law lands.
- Budget the 70 kW band and lighting controls against the EU dates, 2027 and 2029.
In every case:
- Record rated outputs for heating and cooling, and how you tested the threshold.
- Keep your feasibility reasoning in writing.
- Check penalties in national law. The directive sets no figure. Article 34 asks states for penalties that are "effective, proportionate and dissuasive".
Our BMS retrofit guide covers upgrading an older system rather than replacing it, and our BEMS guide covers the metering and fault detection that Article 13(10)(b) asks for.
How do EU rules compare with the UK and India?
Regulation by region
| Region | Rule | BACS trigger | Status on 7 Nov 2026 |
|---|---|---|---|
| EU | Directive (EU) 2024/1275, Art 13, through national law | Over 290 kW (2024) and over 70 kW (2029), existing and new non-residential | Transposition late in all 27 states; formal notice 15 Jul 2026 |
| UK (England) | Approved Document L, Volume 2, paras 6.66 and 6.67 | Over 180 kW: new buildings; existing buildings when a BACS is installed or replaced | In force; the EPBD doesn't apply |
| India | ECSBC 2024 (BEE) | Commercial buildings with connected load of 100 kW or contract demand of 120 kVA and above | Applies through state adoption |
The EU is the only one of the three that sets a retrofit date for existing buildings. England bites at new build and replacement. India's ECSBC 2024 sets controls for new commercial buildings, through state adoption. For the US and the Gulf, see the comparison in our Article 13 explainer.
If you export from India: what does this tracker mean for MEP and SI firms?
The EPBD doesn't bind an Indian firm. It reaches you through the contract when you design, supply or integrate controls for a building in the EU. Then the owner's national duty becomes your scope.
- Ask the client which national law applies, and price to it. In Finland that's the 2020 act on automation and control systems. In Germany it's GModG section 56.
- Write all four Article 13(10) functions into the deliverables, IEQ monitoring included.
- Watch the 13 fast movers in the table. New national texts mean new acceptance tests.
- Hand over the documents the owner will need later: rated outputs, the threshold method, any feasibility note and the points list.
For sensors behind IEQ monitoring, our CO2 sensor explainer covers NDIR basics.
Questions to ask your BMS vendor or adviser
- Which national law and which article did you design to, and what date applies to this building?
- Has that country notified new measures since 15 July 2026, and did you read them?
- How did you test the 290 kW and 70 kW thresholds: heating and cooling separately or added?
- Does the system cover all of Article 13(10), including IEQ monitoring, out of the box?
- Which lighting zones have occupancy detection, ahead of the 2027 or 2029 date?
- Who owns the points list, configuration and logged data after handover?
- If national law changes during the project, how will the change be priced?
- What feasibility evidence will you hand over if a function is left out?
For the architecture behind these answers, start with our building management system guide.
Free download: EPBD transposition tracker (Excel)
- 27-country table with source URL and last-checked date in every row
- Summary sheet with COUNTIF status counts and key EPBD dates
- Yellow columns for your own checks and notes, plus a sources sheet
FAQs
What is the EPBD transposition deadline? 29 May 2026 for most of Directive (EU) 2024/1275, and 1 January 2025 for Article 17(15) on fossil boiler subsidies (Article 35(1)).
Has any country fully transposed the EPBD? None had, according to the Commission on 15 July 2026, when it sent formal notices to all 27. We found no Commission statement since then that clears any state, as of 7 November 2026.
Is there an EPBD infringement in 2026? Yes. Formal notices went to all 27 states on 15 July 2026. Separately, nine states got reasoned opinions on 1 October 2026 over draft renovation plans.
Does the BACS duty apply if my country hasn't transposed? The directive binds states, not owners, so your duty comes from national law. The 290 kW duty dates from Directive (EU) 2018/844 and should already be national law. Take local legal advice for your building.
Where can I check the national law for my country? The EUR-Lex national transposition page for CELEX 32024L1275 lists every notified measure, with links where the state gave them. Our table and Excel file name one example per country.
What penalties apply to owners? The directive sets no amounts. Article 34 requires each state to set penalties that are effective, proportionate and dissuasive.
Planning a BACS assessment or upgrade for an EU site? See our smart building solutions or talk to Asset Online Pvt Ltd (AOPL).
Sources
- Directive (EU) 2024/1275, Official Journal L, 8 May 2024: Arts 3, 13, 17(15), 34, 35, 37, 38 (Tier 1)
- Directive (EU) 2018/844: BACS over 290 kW by 2025; transposition by 10 March 2020 (Tier 1)
- EUR-Lex national transposition measures, CELEX 32024L1275, read 7 Nov 2026 (Tier 1)
- Publications Office SPARQL endpoint: measure records, deadlines and notification dates, queried 7 Nov 2026 (Tier 1)
- European Commission, DG Energy: formal notice to all 27 states, 15 July 2026; March 2026 package; September 2026 package; October 2026 package (Tier 1)
- November 2025 infringements package, EU Transition Pathways copy (Tier 1)
- TFEU Article 258 and Article 260 (Tier 1)
- Germany, Gebäudemodernisierungsgesetz, section 56, as last amended 23 July 2026 (Tier 1)
- UK, Approved Document L, Volume 2, 2021 edition incorporating 2023 amendments (Tier 1)
- India, ECSBC 2024, Bureau of Energy Efficiency (Tier 1)
Change log
- 7 Nov 2026: First published. 27 states classified from EUR-Lex data (478 measures). All 27 at formal notice stage since 15 July 2026; no reasoned opinion on transposition found. Next review due by 7 Feb 2027, or sooner if the Commission issues reasoned opinions.