Short answer: UK CBAM is a new UK tax on the direct emissions embodied in imported aluminium, cement, fertiliser, hydrogen, and iron and steel goods. It applies to goods imported from 1 January 2027 (Finance Act 2026, section 158). Importers who bring in £50,000 or more of these goods in 12 months (or expect to within 30 days) must register. The tax is emissions × a quarterly rate. Emissions come from verified supplier data or HMRC default values.
Applies to: UK importers, and producers in India or any other country that ship these goods to the UK. EU CBAM is compared throughout.
This post covers who pays, how the rate is set, UK CBAM vs EU CBAM, the plant data and records needed, and the India angle.
Key takeaways
- UK CBAM applies to goods imported into the UK on or after 1 January 2027, and covers only direct emissions at launch (Finance Act 2026 s.158; HMRC policy paper, 9 Sep 2026).
- An importer must register once CBAM imports reach £50,000 in the previous 12 months, or are expected to reach £50,000 within the next 30 days (Finance Act 2026, Schedule 17, paragraph 2).
- HMRC's illustrative rates, built on a Q3 2026 UK ETS average of £58.15, range from £1.45/tCO2e for fertiliser to £9.79/tCO2e for aluminium (HMRC, 16 Oct 2026).
- The first UK CBAM return covers all of 2027 and is due with payment by 31 May 2028; quarterly periods start on 1 January 2028 (HMRC CBAM policy summary).
- India's Carbon Credit Trading Scheme is on HMRC's list of qualifying carbon pricing schemes, so a carbon price actually paid under it may count towards UK carbon price relief (emissions covered by free allowances get none) (HMRC list, 27 Aug 2026).
What is UK CBAM and when does it start?
UK CBAM (Carbon Border Adjustment Mechanism) is a tax on the greenhouse gases released in making certain carbon-heavy goods outside the UK. Part 5 of the Finance Act 2026 (sections 142 to 158) created it. Section 143 charges the tax "on the emissions embodied in a CBAM good when the good is imported into the United Kingdom". Section 158(1) applies it to goods imported on or after 1 January 2027.
The detail sits in 2026 regulations, mainly S.I. 2026/802 (administration), S.I. 2026/809 (rates and carbon price relief) and the Emissions and Verification Regulations, S.I. 2026/995. HMRC "force of law" notices carry the monitoring rules and default values.
Two pieces are still moving as of 25 October 2026: HMRC takes feedback on its MRV technical guidance until 13 November, and the first real quarterly rates come out before year end.
Which goods are covered by UK CBAM?
Five sectors, listed in section 143(3) and identified by commodity code in Schedule 16:
- Aluminium: headings 7601 and 7603 to 7616 (except 7615).
- Cement: clinker, Portland and other hydraulic cements, and some kaolinic clays.
- Fertilisers: nitric acid, ammonia, potassium nitrate, nitrogenous fertilisers (3102) and NPK mixtures (3105, except 3105 60 00).
- Hydrogen: CN 2804 10 00.
- Iron and steel: agglomerated iron ore, all of Chapter 72 except listed ferro-alloys and scrap (7204), plus 13 downstream headings in Chapter 73 such as tubes, structures, containers and fasteners (7318).
Glass and ceramics were dropped from the 2027 start in October 2024, and electricity is not covered, unlike in the EU. Indirect emissions (from electricity used in production) are also out at launch, as "announced at Budget 2025", says the HMRC policy paper.
Who pays UK CBAM and when must they register?
The importer pays, not the overseas producer. Under section 146 that is the person in whose name, or on whose behalf, the customs declaration is made. A tax agent can file returns but cannot register for the importer, says the HMRC CBAM policy summary.
The registration trigger is in Schedule 17, paragraph 2 and has two tests:
- Backward test: on the first day of each month, CBAM imports in the previous 12 months total £50,000 or more.
- Forward test: you expect to import £50,000 or more of CBAM goods within the next 30 days.
Value means customs value. You normally register within 30 days of triggering, but registration only opens on 1 January 2028, so anyone liable in 2027 has until 31 January 2028. Importers below the threshold pay nothing (section 147(1)). HMRC expects the threshold to exclude over 80% of otherwise affected importers, leaving about 10,000 businesses significantly affected.
How is the UK CBAM rate set?
There is one rate per sector per quarter, set by HM Treasury under section 149:
- Take the average UK ETS auction clearing price in the previous quarter.
- Reduce it by the sector's baseline free allocation percentage (share of sector emissions covered by free allowances in 2019, 2022 and 2023), adjusted by that year's phase-out factor.
HMRC's illustrative rates and worked example of 16 October 2026 use a Q3 2026 UK ETS average of £58.15. For cement, free allowances covered 87.1% of emissions and the 2027 phase-out factor is 97.5%. The rate works out at £58.15 × (1 − 87.1% × 97.5%) = £8.78 per tCO2e. The other illustrative rates are £9.69 for iron and steel, £9.79 for aluminium, £9.24 for hydrogen and £1.45 for fertiliser.
Rates are low today because UK producers still get most allowances free. They rise as free allocation is phased out.
At these rates and HMRC default values, a tonne of hot-rolled coil under CN 7208 10 00 (default 2.722 tCO2e/t; other hot-rolled coil codes run from 2.649 to 3.778) would attract about £26, and a tonne of hydrogen (28.378 tCO2e/t) about £262, before relief. That is our arithmetic on HMRC's numbers.
UK CBAM vs EU CBAM: what are the differences?
HMRC says its monitoring rules are "broadly designed to support interoperability with the EU CBAM". The mechanics still differ. This table compares the UK law with Regulation (EU) 2023/956 as amended by Regulation (EU) 2025/2083 of 8 October 2025.
| Point | UK CBAM | EU CBAM |
|---|---|---|
| Legal base | Finance Act 2026, Part 5, plus S.I.s 2026/802, 809, 830, 994, 995 | Regulation (EU) 2023/956, amended by Regulation (EU) 2025/2083 |
| Financial obligation starts | Goods imported from 1 Jan 2027 (s.158) | Definitive period from 1 Jan 2026; reporting-only transitional period before that |
| Sectors | Aluminium, cement, fertiliser, hydrogen, iron and steel | The same five, plus electricity |
| Emissions in scope | Direct only at launch | Direct for iron and steel, aluminium, hydrogen and electricity (Annex II); direct and indirect for cement and fertiliser |
| Who is liable | The importer (s.146); a tax agent may file | The authorised CBAM declarant (importer or indirect customs representative) |
| Threshold | £50,000 customs value: past 12 months, or expected in next 30 days (Sch 17 para 2) | 50 tonnes net mass per importer per calendar year, all CN codes combined (Art 2a, Annex VII); not applied to electricity or hydrogen |
| Getting in | Register with HMRC; registration opens 1 Jan 2028, deadline 31 Jan 2028 for first-year liability | Become an authorised declarant before passing 50 t; applicants by 31 Mar 2026 could keep importing while pending |
| How the price is set | Quarterly sector rate: UK ETS average × (1 − free allocation share × phase-out factor) (s.149) | Certificates priced at weekly average EU ETS auction price; quarterly average for 2026 imports (Art 21) |
| Default values | One value per CBAM good, same for every origin; return cannot later be amended to actual data | Average intensity of each exporting country plus a mark-up (Annex IV, point 4.1) |
| Verification | Required for actual data; verifier accredited to ISO 14065 and ISO/IEC 17029; 5% materiality; site visit | Required for actual values only (Art 8 and recital 19); not needed when default values are used |
| Carbon price relief | Relief for carbon prices paid under a qualifying scheme, backed by a verified carbon pricing verification form | Deduction of carbon price effectively paid in the country of origin (Art 9) |
| Reporting and payment | Return and payment for 2027 by 31 May 2028; then quarterly from 2028, with the filing window narrowing to 2 months by the third quarter | Annual declaration and certificate surrender by 30 Sep, first in 2027 for 2026; certificate sales from 1 Feb 2027; hold 50% of year-to-date certificates each quarter from 2027 |
| Penalties | Existing HMRC penalties (failure to notify, file, pay, inaccurate returns), £500 fixed penalty for record failures, criminal offences for fraudulent evasion (Sch 18) | Per unsurrendered certificate, equal to the EU ETS excess emissions penalty; 3 to 5 times that for non-authorised importers (Art 26) |
| Record retention | 6 years | Until the end of the fourth year after the year the declaration was due (Art 7(6), Art 9(3)) |
For an overseas plant, one good monitoring system can serve both, though each scheme needs its own verified output.
What emissions data must an overseas producer supply?
The importer reports an emissions intensity (tCO2e per tonne of good), which HMRC multiplies by net weight. Without a verified figure from the producer, the importer must use the default value, as HMRC's guidance for overseas installations states. The policy summary sets out eight steps; the plant does steps 1 to 7:
- Take one calendar year as the monitoring period.
- Attribute the installation's verified direct emissions to each CBAM good, using the System Boundaries Document.
- Convert non-CO2 gases to CO2e: N2O × 265, CF4 × 6,630, C2F6 × 11,100.
- Add them up.
- Add the embedded emissions of precursors (for example crude steel used in a rolling mill, or ammonia used in urea).
- Find the tonnes of that good produced in the year.
- Divide, rounding to five decimal places.
Step 8 is the importer's job: intensity × imported weight.
The verifier must be accredited by a Global Accreditation Cooperation member, visit the site, and test misstatements against 5% of the good's emissions intensity. The producer then sends the importer the verification report or a good-specific summary.
For 2027 imports, the importer uses verified 2027 data, or 2026 data if 2027 is not ready. So a plant needs 2026 or 2027 data verified before the first return falls due on 31 May 2028.
How do monitoring systems produce CBAM-grade data?
HMRC's MRV technical guidance (313 pages, 16 Oct 2026) allows two ways to measure direct emissions (section C3.8.3.1):
- Calculation-based: fuel and material quantities times calculation factors from carbon content. This is the norm for CO2.
- Measurement-based: gas concentration plus flue-gas flow at each stack, using a continuous emission monitoring system (CEMS). It is mandatory for N2O, as in nitric acid and fertiliser plants, and allowed for CO2 only where it is shown to be more accurate (section D4.6.2).
Meter accuracy is specified too (section D4.6.1.4.3). A major source stream above 500,000 tCO2 a year needs metering uncertainty of 1.5% or less; minor streams under 10,000 tCO2 must stay below 7.5%. Fuel can be metered continually (gas flow meters) or by batch (weighbridge records with year-start and year-end stock counts).
All of this goes into a monitoring plan, a single live document covering what is monitored, how data is collected and checked, how emissions are calculated, data-flow controls and data gaps. For CEMS it names the instruments and their calibration routine. On the plant floor that means:
- Fuel and material metering for every source stream, with calibration certificates.
- Production metering per CBAM good, since intensity is emissions divided by tonnes produced.
- CEMS with flow measurement where you use the measurement route or must measure N2O. If a stack already has CEMS for pollution control, check that it measures CO2 or N2O and flue-gas flow, not just dust and SO2. Our explainer on manual stack sampling vs CEMS covers the hardware.
- Electricity sub-metering per line, since EU CBAM counts indirect emissions for cement and fertiliser. See our guide to energy monitoring systems for factories.
- A data platform with audit trails from meter to report, the core of an environmental intelligence platform.
Asset Online Pvt Ltd (AOPL) supplies and integrates solutions in this area.
What records must UK importers and overseas producers keep?
HMRC's record-keeping guidance requires importers to keep records in written or electronic form for 6 years, and warns of a £500 fixed penalty for failing to keep them. The table below is a working checklist built from that guidance, the policy summary and the technical guidance.
| Who | Record | Why it matters |
|---|---|---|
| Importer | 8-digit commodity code and description of each good | Sets the sector, rate and default value |
| Importer | Date the good passed the tax point and the quarter | Sets which quarterly rate applies |
| Importer | Customs value | Drives the £50,000 registration tests |
| Importer | Net weight in kg, excluding packaging, with evidence (declaration, invoice, packing list) | Weight × intensity = embodied emissions; HMRC can estimate if missing |
| Importer | Country of origin (non-preferential rules) | Required on the return; needed for relief |
| Importer | Verification report or good-specific summary | Needed to report actual emissions instead of defaults |
| Importer | Carbon pricing verification form, scheme price, FX conversion | Supports any carbon price relief claim |
| Importer | Evidence for exemptions (UK origin, returned goods) | Needed if the good is left off the return |
| Producer | Monitoring plan, with versions and change log | Primary document the verifier checks |
| Producer | Fuel, material and production meter readings, and calibration certificates | Basis of calculation-based emissions |
| Producer | CEMS data, QA checks and data-gap handling | Basis of measurement-based emissions, including N2O |
| Producer | Precursor sources, quantities and their intensities | Added in step 5 of the calculation |
| Producer | Carbon price paid, free allocation and rebates received | Needed for the carbon pricing verification form |
What does UK CBAM mean if you export from India?
UK imports of Indian iron and steel (HS 72) rose from USD 306 million in 2023 to USD 610 million in 2025, lifting India's share of all UK HS 72 imports from 4.6% to 8.7%, according to UN Comtrade data reported by the UK. Indian aluminium (HS 76) to the UK was smaller, at USD 96 million in 2025.
Three points for Indian exporters:
- Your buyer pays, but your data sets the bill. Without verified plant data your UK customer must use the default value, and a return filed on defaults cannot be amended later.
- CCTS can reduce the charge. HMRC's list of qualifying carbon pricing schemes (based on information to 19 June 2026) includes the Indian Carbon Credit Trading Scheme. Relief depends on the effective price actually paid after free allowances and rebates, and needs a verified carbon pricing verification form. Our post on the Carbon Credit Trading Scheme in India explains the targets and what to measure.
- Build one MRV system for three regimes. The same meters, CEMS and monitoring plan can feed UK CBAM, EU CBAM and CCTS reports. Our guide to ESG and GHG monitoring with IoT shows how sensor data flows into BRSR Core as well.
Regulation by region
| Region | Rule | Status for these goods |
|---|---|---|
| UK | Finance Act 2026 Part 5 (UK CBAM) | Charge from 1 Jan 2027; first return 31 May 2028 |
| EU | Regulation (EU) 2023/956 as amended by 2025/2083 | Definitive period since 1 Jan 2026; first surrender 30 Sep 2027 |
| EU exemptions | Annex III of Regulation 2023/956 | Goods from Iceland, Liechtenstein, Norway and Switzerland are outside EU CBAM |
| India | Carbon Credit Trading Scheme | Listed by HMRC as a qualifying scheme for UK carbon price relief |
Section 156 lets the UK exempt goods from countries with an ETS linked to the UK ETS; none is exempt yet.
Checklist: questions to ask before 1 January 2027
For UK importers:
- Which purchases fall under Schedule 16 codes, and do we pass either £50,000 test in 2027?
- Do our records hold net weight, origin and tax-point date per consignment?
- Which suppliers can give verified 2026 or 2027 emissions intensity, and which will default?
For overseas producers:
- Do we have a monitoring plan that meets UK and EU rules?
- Do our fuel and material meters meet the 1.5% and 7.5% uncertainty limits, with calibration records?
- If we make nitric acid or nitrogen fertiliser, do we run CEMS with flow measurement for N2O?
- Have we booked an accredited verifier for the 2026 or 2027 monitoring year?
- Can we document the carbon price we pay under CCTS or another scheme for the verification form?
FAQs
Does UK CBAM apply to goods from the EU? Yes, for now. No country is exempt yet, but the EU ETS is a qualifying scheme, so EU goods can claim relief for carbon price paid.
What is the UK CBAM registration threshold? £50,000 of CBAM goods by customs value, tested on the first day of each month over the past 12 months, or expected within the next 30 days (Finance Act 2026, Schedule 17, paragraph 2).
Is UK CBAM 2027 charged on indirect emissions? No. From 1 January 2027 the charge covers direct emissions only. HM Treasury removed indirect emissions from the starting scope at Budget 2025.
Can an importer switch from default values to actual data later? Not on a return already filed. HMRC says a return that uses default values cannot later be amended with actual emissions data.
When is the first UK CBAM payment due? The first accounting period is all of 2027. The return and payment are due by 31 May 2028. Quarterly periods start in 2028, with the first quarterly return due 31 July 2028.
Need verifiable plant emissions data for UK CBAM, EU CBAM and CCTS? Talk to AOPL about metering, CEMS and an audit-ready data platform.
Sources
- Finance Act 2026, Part 5 (sections 142 to 158), legislation.gov.uk
- Finance Act 2026, Schedule 17, Part 2 (registration), legislation.gov.uk
- The Carbon Border Adjustment Mechanism (Emissions and Verification) Regulations 2026, S.I. 2026/995
- HMRC: CBAM policy summary, updated 16 Oct 2026
- HMRC: Carbon Border Adjustment Mechanism policy paper, 9 Sep 2026
- HMRC: Illustrative CBAM rates and worked example, 16 Oct 2026
- HMRC: Iron and steel default values, 16 Oct 2026
- HMRC: Keeping records for CBAM, 16 Oct 2026
- HMRC: Monitoring emissions as an overseas installation
- HMRC: CBAM technical guidance for monitoring, verifying and reporting emissions (PDF)
- HMRC: List of current qualifying carbon pricing schemes, 27 Aug 2026
- Regulation (EU) 2023/956 establishing a carbon border adjustment mechanism, EUR-Lex
- Regulation (EU) 2025/2083 simplifying and strengthening the CBAM, EUR-Lex
- UN Comtrade: UK imports from India, HS 72, 73, 76, accessed 25 Oct 2026