Updated 27 Oct 2026: added a section on how the same Scope 1 and 2 meter data now feeds India's carbon credit scheme and the EU and UK carbon border taxes, with links to our CCTS and UK CBAM guides. Facts checked against gov.uk, the European Commission and ICAP.
Short answer: SEBI's BRSR Core asks India's top listed companies to report a fixed set of ESG numbers and get them independently assessed or assured: the top 1,000 by market capitalisation from FY 2026-27. Half of its nine attributes are environmental (GHG, water, energy, waste), and SEBI's own format names fuel logs, purchased energy data and calibrated water meter logs as the data source. IoT metering turns those numbers from year-end estimates into records an assessor can check.
This guide explains what BRSR Core requires, what can be metered, how to calculate Scope 1 and 2, and what to put in place before your next reporting year.
What is BRSR Core?
SEBI introduced the Business Responsibility and Sustainability Report (BRSR) in May 2021. In July 2023 it added BRSR Core: a subset of BRSR KPIs that must be independently verified, plus ESG disclosures for the value chain (SEBI circular SEBI/HO/CFD/CFD-SEC-2/P/CIR/2023/122, 12 July 2023).
In March 2025, SEBI changed the rules to ease the burden. Companies may now choose either "assurance" or "assessment", which means third-party assessment against standards developed by the Industry Standards Forum in consultation with SEBI (SEBI circular SEBI/HO/CFD/CFD-PoD-1/P/CIR/2025/42, 28 March 2025). The same circular says BRSR Core has KPIs under 9 ESG attributes, with intensity ratios based on revenue adjusted for purchasing power parity.
Who has to comply, and when?
| Requirement | Who | From |
|---|---|---|
| BRSR Core assessment or assurance | Top 150 listed entities | FY 2023-24 |
| Top 250 | FY 2024-25 | |
| Top 500 | FY 2025-26 | |
| Top 1,000 | FY 2026-27 | |
| Value chain ESG disclosures | Top 250, voluntary | FY 2025-26 |
| Assessment or assurance of value chain data | Top 250, voluntary | FY 2026-27 |
The value chain definition changed in 2025 too. It now covers upstream and downstream partners that individually make up 2% or more of purchases or sales by value, and a company may limit its disclosure to 75% of purchases and sales.
Here's why unlisted companies should care. If you're a large supplier to a top-250 company, you may be asked for your energy, emissions and water data, even though the disclosure is voluntary for now. Having metered numbers ready makes you an easier supplier to keep.
What are the 9 BRSR Core attributes?
| # | Attribute | Can IoT metering help? |
|---|---|---|
| 1 | Greenhouse gas footprint (Scope 1, Scope 2, intensity) | Yes: fuel flow, energy meters |
| 2 | Water footprint (consumption, intensity, discharge by treatment) | Yes: flow meters |
| 3 | Energy footprint (total, % renewable, intensity) | Yes: energy and fuel meters, solar generation |
| 4 | Embracing circularity (waste by category, recovery, disposal) | Partly: weighbridges, bin weights |
| 5 | Employee wellbeing and safety | No (HR and safety records) |
| 6 | Gender diversity in business | No |
| 7 | Inclusive development | No |
| 8 | Fairness with customers and suppliers | No |
| 9 | Openness of business | No |
Source: SEBI, Format of BRSR Core.
So four of the nine attributes are mostly physical measurements. They're also the ones where errors creep in most, because data comes from many sites, meters and spreadsheets.
What can be metered, and how?
The BRSR Core format spells out the data behind each environmental number:
Scope 1 (direct emissions from sources the company owns or controls) is built from fuel consumption multiplied by an emission factor (IPCC or accredited lab testing), less carbon captured, plus process and fugitive emissions. Diesel for DG sets, natural gas for boilers and furnaces, and refrigerant top-ups for HVAC all count.
Scope 2 (indirect emissions from purchased energy) is total purchased electricity, steam and cooling multiplied by an emission factor. For grid electricity in India, most companies use the Central Electricity Authority's CO2 baseline database. Version 19 (December 2023) advised 0.716 tCO2/MWh as the grid emission factor for FY 2022-23 (CEA, CO2 Baseline Database User Guide, Version 19.0). CEA publishes newer versions each year, so use the latest one available for your reporting year.
A worked example: a plant that buys 5,000 MWh of grid power in a year would report about 3,580 tonnes of CO2 as Scope 2 at 0.716 tCO2/MWh (5,000 × 0.716). Meter the 5,000 MWh accurately and the rest is arithmetic.
Water consumption can be calculated, the format says, from calibrated input and output flow meter logs: consumption equals input minus output.
Energy footprint adds fuel, purchased energy and self-generated energy, counting it only once. Rooftop solar generation counts towards the renewable share.
The GHG Protocol Corporate Standard, which BRSR Core names as the method for GHG accounting, was first published in 2004 and updated in 2015 with Scope 2 guidance (GHG Protocol, Corporate Standard).
Why do metered numbers matter for assurance?
An assessor wants to trace each reported number back to evidence. Year-end figures pieced together from utility bills and fuel invoices often fail on three points:
- Gaps. Missing months, sites or meters, filled with estimates nobody documented.
- Boundaries. DG diesel bought centrally but used at several sites; tenants sharing a meter.
- Calibration. SEBI's format specifically mentions calibrated meters for water. Uncalibrated meters weaken the evidence.
An IoT metering layer helps by logging energy, fuel and water continuously, time-stamping every reading, flagging gaps when a meter stops reporting, and keeping a calibration record against each meter ID. Our guide on smart energy meters and sub-metering covers meter types.
Does the same meter data serve CCTS and CBAM?
Mostly, yes. BRSR Core is no longer the only rule asking Indian plants for verifiable emissions data. Two more now draw on the same fuel, electricity and production records.
India's Carbon Credit Trading Scheme (CCTS). Compliance obligations covered about 490 entities in seven sectors by March 2026: aluminium, cement, chlor-alkali, pulp and paper, petroleum refining, petrochemicals and textiles (ICAP, 30 March 2026). Each plant has an emission intensity target per tonne of product for FY 2025-26 and FY 2026-27. Iron and steel and fertiliser targets were still pending at that date. Our CCTS guide covers targets, penalties and what to measure.
EU CBAM. The EU's carbon border mechanism has applied in its definitive regime since 1 January 2026, with authorisation duties for importers (European Commission). EU buyers of Indian steel, aluminium, cement and fertiliser need embedded emissions data from the plant that made the goods.
UK CBAM. The UK version starts on 1 January 2027. It hits businesses importing £50,000 or more of aluminium, cement, fertiliser, hydrogen, or iron and steel goods over 12 months, and covers direct emissions only at the start (HMRC, gov.uk). See our UK CBAM guide.
| Rule | Who reports | Unit | What the meters must support |
|---|---|---|---|
| BRSR Core | Top 1,000 listed companies from FY 2026-27 | Company totals, intensity per revenue | Fuel, purchased energy, water, waste |
| CCTS | Notified plants in seven sectors | tCO2e per tonne of product | Fuel, electricity and output per plant |
| EU CBAM | EU importer, using producer data | Embedded emissions per tonne of good | Installation-level fuel, process and output data |
| UK CBAM | UK importer above £50,000 a year | Direct embedded emissions per good | Installation-level fuel, process and output data |
The difference is the boundary. BRSR Core adds up the whole company. CCTS and both CBAMs want numbers per plant, per product line, tied to production output. A metering layer built only for a group-level ESG report often can't split energy by line or by product. If you sell into the EU or UK, or you're on a CCTS list, meter by process line and log production counts on the same timestamps.
What should companies do in the next 12 months?
- Map the boundary. List every site, DG set, boiler, chiller, solar plant and water source in scope.
- Compare data to the format. For each BRSR Core environmental KPI, note where the number comes from today, and whether it's metered, billed or estimated.
- Meter the big flows first. Main incomers, DG sets, boilers, bore wells and municipal water inlets usually cover most of the total.
- Fix calibration. Set a schedule and keep certificates per meter.
- Centralise. One platform that collects meter data from all sites, rather than monthly spreadsheets by email.
- Ask your largest customers what they need. If you're in the value chain of a top-250 company, find out what data they'll ask for and in what format.
For plants that also monitor emissions or ambient air, see our guide on CEMS vs CAAQMS vs PEMS.
Questions to ask an ESG monitoring vendor
- Which BRSR Core KPIs will the system calculate directly from meter data?
- Which emission factors does it use, and can we update the CEA grid factor each year?
- Does it keep raw meter readings with timestamps, and for how long?
- How does it flag missing data, and how are estimates recorded?
- Can it store calibration certificates against each meter?
- Can our assessor get read-only access to the audit trail?
- Can it produce data in the format our customers ask for in value chain requests?
FAQs
What is BRSR Core? A subset of SEBI's BRSR with KPIs under 9 ESG attributes that top listed companies must get assessed or assured, on a glide path reaching the top 1,000 in FY 2026-27.
Is assurance still mandatory for BRSR Core? Yes, but since March 2025 companies can choose third-party assessment under Industry Standards Forum standards or assurance.
Are value chain ESG disclosures mandatory? No. Since March 2025 they're voluntary for the top 250 listed companies from FY 2025-26, with voluntary assessment or assurance from FY 2026-27.
How is Scope 2 calculated for Indian companies? Purchased electricity multiplied by an emission factor. Most companies use the latest CEA CO2 baseline database grid factor.
Is BRSR Core data enough for CBAM or CCTS? Not on its own. BRSR Core reports company totals, while CCTS and CBAM need emissions per plant and per tonne of product, so meters must be split by process line.
Can IoT replace an ESG assessor? No. Metering produces the evidence; the independent assessor or assurance provider still has to check it.
Building a metering layer for BRSR Core? See our environmental intelligence solutions, our energy and power metering range, or talk to us.
Sources
- SEBI, BRSR Core: Framework for assurance and ESG disclosures for value chain, circular dated 12 July 2023 (via NSE)
- SEBI, Format of BRSR Core, Annexure I to the July 2023 circular
- SEBI, Measures to facilitate ease of doing business: assurance or assessment, value chain and green credits, circular dated 28 March 2025
- Central Electricity Authority, CO2 Baseline Database for the Indian Power Sector, User Guide Version 19.0, December 2023
- GHG Protocol, Corporate Accounting and Reporting Standard
- ICAP, Compliance obligations under India's Carbon Credit Trading Scheme enter into force for seven sectors, 30 March 2026
- European Commission, Carbon Border Adjustment Mechanism
- HM Revenue and Customs, Carbon Border Adjustment Mechanism (CBAM), gov.uk