Short answer: NIS2 Implementing Regulation 2024/2690 is the EU act that turns NIS2's security duties into specific rules for data centres, cloud providers, MSPs, MSSPs, DNS, CDN and trust service providers. It has applied since 7 November 2024. The Annex sets 13 requirement areas with 161 numbered points, and Articles 3 to 14 define a significant incident. A complete MSP outage over 30 minutes counts. Any complete data centre outage counts.

Free Excel tool NIS2 2024/2690 Gap Assessment comes free with this guide. Download now ↓

Applies to: EU, and any provider outside the EU (India included) that offers these services in the EU. UK, US, Saudi Arabia and India rules compared below.

This post covers who NIS2 Implementing Regulation 2024/2690 applies to, the significant incident thresholds by provider type, the reporting clock, all 13 Annex areas mapped to ISO/IEC 27001:2022 using ENISA's mapping table, what Indian MSPs and data centres serving EU clients must do, and a free Excel gap assessment.

Key takeaways

  • An incident is significant for a covered provider if it causes, or could cause, a direct financial loss above EUR 500,000 or 5% of annual turnover, whichever is lower (Regulation 2024/2690, Article 3(1)(a)).
  • For MSPs and MSSPs, a managed service that is completely unavailable for more than 30 minutes is a significant incident (Article 10(a)). For data centre providers, any complete unavailability of a data centre service is enough (Article 8(a)).
  • A significant incident needs an early warning within 24 hours, a notification within 72 hours and a final report within one month of the notification (Directive (EU) 2022/2555, Article 23(4)).
  • The Annex holds 161 numbered points across 13 areas, and area 6 (acquisition, development and maintenance) alone has 31 of them (AOPL count of the Official Journal text, 18 October 2024).
  • An MSP or data centre provider that is not established in the EU but offers services there must designate a representative in a member state where it offers services (Directive (EU) 2022/2555, Article 26(3)).

What is NIS2 Implementing Regulation 2024/2690?

It is Commission Implementing Regulation (EU) 2024/2690 of 17 October 2024, published in the Official Journal on 18 October 2024. Article 16 says it enters into force on the twentieth day after publication, which was 7 November 2024. It is "binding in its entirety and directly applicable in all Member States", so no national law is needed for it to apply.

NIS2 (Directive (EU) 2022/2555) lists ten security measures in Article 21(2), points (a) to (j). Article 21(5) told the Commission to set the technical detail for a named group of digital providers by 17 October 2024. Regulation 2024/2690 is that act, and it repeals the older NIS1 rule, Implementing Regulation 2018/151 (Article 15).

The regulation does two jobs:

  1. Article 2 and the Annex set the technical and methodological requirements for the Article 21(2) measures.
  2. Articles 3 to 14 spell out when an incident is "significant" and must be reported under Article 23 of NIS2.

One rule in Article 2 matters in every audit. If you decide an Annex point marked "where appropriate" doesn't apply to you, you must write down why.

Who does Regulation 2024/2690 cover, and does size matter?

Article 1 names the "relevant entities": DNS service providers, TLD name registries, cloud computing service providers, data centre service providers, content delivery network providers, managed service providers, managed security service providers, online marketplaces, online search engines, social networking platforms and trust service providers.

The definitions are wide. An MSP installs, manages, operates or maintains ICT products, networks, infrastructure or applications, on site or remotely (Article 6(39)). An MSSP is an MSP that does or assists with cybersecurity risk management (Article 6(40)). A data centre service covers housing and running IT and network equipment, together with the power distribution and environmental control (Article 6(31)).

Size matters. NIS2 applies to medium-sized and larger entities of the types in its Annexes (Article 2(1)). DNS service providers, TLD registries and trust service providers are covered regardless of size (Article 2(2)(a)). Data centres, cloud and CDN providers sit in Annex I sector 8 (digital infrastructure), and MSPs and MSSPs in Annex I sector 9 (ICT service management, business to business). Those above the medium-sized ceilings are essential entities. Medium-sized ones are important entities (Article 3).

The category sets the fine. Member states must allow maximum fines of at least EUR 10 million or 2% of worldwide annual turnover for essential entities, and EUR 7 million or 1.4% for important entities, whichever is higher (Article 34(4) and (5)). At the ECB reference rate of 12 November 2026 (EUR 1 = ₹104.2118), that is about ₹104.2 crore and ₹72.9 crore.

What counts as a significant incident for data centres and MSPs?

Article 3 sets general triggers that apply to every relevant entity. Any one of them is enough:

  • direct financial loss above EUR 500,000 or 5% of the previous year's total annual turnover, whichever is lower (about ₹5.21 crore or USD 554,050 at the ECB rates of 12 November 2026)
  • exfiltration of trade secrets
  • death of a person, or considerable damage to a person's health
  • successful, suspectedly malicious and unauthorised access capable of causing severe operational disruption
  • recurring incidents (Article 4)
  • the entity-specific criteria in Articles 5 to 14

Article 4 catches slow-burn problems: smaller incidents count as one significant incident if they occurred at least twice in 6 months, share an apparent root cause and together pass the financial loss test.

When you count affected users, include contracted customers and the people at business customers who use the service (Article 3(3)).

The entity-specific thresholds are the ones operations teams need on the wall.

Provider type Complete outage Limited availability Data integrity, confidentiality or authenticity Other
Data centre service provider (Art. 8) Any complete unavailability of a data centre service Limited for more than 1 hour Compromised by a suspectedly malicious action Physical access to a data centre is compromised
MSP and MSSP (Art. 10) More than 30 minutes More than 5% of EU users or 1 million EU users, whichever is smaller, for more than 1 hour Compromised by suspected malice; or with impact on more than 5% or 1 million EU users None
Cloud computing provider (Art. 7) More than 30 minutes Same 5% or 1 million test, more than 1 hour Same as MSP None
CDN provider (Art. 9) More than 30 minutes Same 5% or 1 million test, more than 1 hour Same as MSP None
DNS service provider (Art. 5) More than 30 minutes Average response time over 10 seconds for more than 1 hour Authoritative data compromised (small misconfiguration exception) None
TLD name registry (Art. 6) Any complete unavailability of authoritative resolution Response time over 10 seconds for more than 1 hour Data on technical operation of the TLD compromised None
Trust service provider (Art. 14) More than 20 minutes Over 1 hour unavailable per calendar week; or more than 1% or 200,000 EU users affected Impact on more than 0.1% or 100 users Physical access to restricted areas compromised
Bar chart of complete outage thresholds under Regulation 2024/2690: trust services over 20 minutes; DNS, cloud, CDN, MSP and MSSP over 30 minutes; data centres and TLD registries any complete outage
Complete unavailability thresholds for a significant incident. Source: Implementing Regulation (EU) 2024/2690, Articles 5 to 10 and 14.

For colocation operators, two points stand out. A complete outage of a data centre service has no grace period. And compromised physical access is a significant incident even if nothing goes down.

What must you report under NIS2, and by when?

Article 23(4) of NIS2 sets the clock once you become aware of a significant incident:

  1. Early warning within 24 hours, saying whether you suspect unlawful or malicious acts or a cross-border impact.
  2. Incident notification within 72 hours, with an initial assessment of severity and impact, and indicators of compromise where available.
  3. Intermediate report if the CSIRT or authority asks for one.
  4. Final report within one month of the notification: detailed description, likely root cause, mitigation, and cross-border impact. If the incident is still running, send a progress report then and the final report within a month of handling it.

Trust service providers have a shorter clock: the notification is due within 24 hours (last subparagraph of Article 23(4)).

Where appropriate, you must also tell the recipients of your services without undue delay (Article 23(1)). For an MSP, that means your customers.

Bar chart of incident reporting clocks: CERT-In 6 hours; NIS2 early warning 24 hours, notification 72 hours, final report one month after notification; UK bill 24 and 72 hours and US CIRCIA 24 and 72 hours shown as not yet in force
Incident reporting clocks in force and pending on 13 Nov 2026. Sources: CERT-In Directions 2022, NIS2 Art. 23(4), GOV.UK, CISA.

If you also fall under CERT-In, its 6-hour report comes due well before the EU early warning. Our comparison of cyber incident reporting requirements by country covers more regimes, including DORA and the SEC rule.

What do the 13 Annex areas of 2024/2690 require?

The Annex follows Article 21(2) of NIS2, area by area. We counted 161 numbered points (such as 3.2.1 or 7.1). Incident handling, acquisition and development, and access control hold almost half of them.

Bar chart of the 161 numbered points in the Annex of Regulation 2024/2690: acquisition and development 31, incident handling 22, access control 21, business continuity 14, asset management 13, risk management 11, HR 10, physical 9, policy 8, supply chain 8, training 8, effectiveness 3, cryptography 3
Numbered points per Annex area. Source: Implementing Regulation (EU) 2024/2690, Annex; AOPL count.

Most points follow one pattern: write a policy, apply it, and review it at planned intervals and after significant incidents. Some carry a fixed frequency:

  • 1.1.2: management bodies review the security policy at least annually.
  • 2.1.4: risk assessment and risk treatment plan reviewed at least annually.
  • 10.1.3: assignment of security roles reviewed at least annually.
  • 3.4.2(b): recurring incidents checked quarterly.
  • 1.2.3: at least one person reports directly to the management bodies on security.

How does the 2024/2690 Annex map to ISO/IEC 27001:2022?

ENISA published a Technical Implementation Guidance in June 2025 (version 1.0) and a separate mapping table, now at version 1.2 (21 August 2025). The table links each Annex sub-section to ISO/IEC 27001:2022, NIST CSF 2.0, ETSI EN 319 401 and several national frameworks. The table below gives ENISA's ISO references only. We have only corrected spacing and letter typos. ENISA says plainly that the table is advisory and "should not be interpreted as a measure of equivalency".

Annex area (NIS2 Art. 21(2) point) ISO/IEC 27001:2022 references, per ENISA mapping table v1.2
1 Security policy, roles (a) 1.1: clauses 5.2, 9.3; A.5.1, A.5.4, A.5.36. 1.2: clause 5.3; A.5.2, A.5.3, A.5.4
2 Risk management (a) 2.1: clauses 6.1, 6.1.2, 6.1.3, 6.2, 8.2, 8.3; A.5.7, A.5.19, A.5.20, A.5.21. 2.2: clause 9.2; A.5.31, A.5.35, A.5.36. 2.3: clauses 9.2, 10.1; A.5.35, A.8.34
3 Incident handling (b) 3.1: A.5.24. 3.2: A.5.28, A.8.15, A.8.16, A.8.17. 3.3: A.6.8. 3.4: A.5.25. 3.5: A.5.26. 3.6: A.5.27
4 Business continuity and crisis (c) 4.1: A.5.29, A.5.30. 4.2: A.8.13, A.8.14. 4.3: A.5.26, A.5.29, A.5.30
5 Supply chain security (d) 5.1: A.5.19, A.5.20, A.5.21, A.8.30. 5.2: A.5.22
6 Acquisition, development, maintenance (e) 6.1: A.5.21, A.5.23. 6.2: A.8.25, A.8.31. 6.3: A.8.9. 6.4: clauses 6.3, 8.1; A.7.13, A.8.32. 6.5: A.8.29, A.8.33, A.8.34. 6.6: A.8.31, A.8.32. 6.7: A.8.16, A.8.20. 6.8: A.8.22. 6.9: A.5.32, A.8.7. 6.10: A.8.8
7 Effectiveness assessment (f) Clauses 6.2, 9.1, 9.3
8 Cyber hygiene and training (g) 8.1: clause 7.3; A.6.3, A.8.7. 8.2: clause 7.2; A.6.3
9 Cryptography (h) A.5.31, A.8.24
10 HR security (i) 10.1: clauses 7.1, 7.2; A.6.2, A.6.3. 10.2: A.6.1. 10.3: A.6.5. 10.4: A.6.4 (ENISA also lists "5.28")
11 Access control and MFA (i), (j) 11.1: A.5.15, A.7.2, A.8.3, A.8.21. 11.2: A.5.3, A.5.18. 11.3 and 11.4: A.8.2, A.8.18. 11.5: A.5.16. 11.6: A.5.17. 11.7: A.8.5
12 Asset management (i) 12.1: A.5.9, A.5.12, A.5.13. 12.2: A.5.9, A.5.10, A.5.14, A.7.10. 12.3: A.7.7, A.7.10. 12.4: A.5.9. 12.5: A.5.11, A.5.18, A.8.24
13 Physical and environmental (c), (e), (i) 13.1: A.7.11. 13.2: A.7.3, A.7.5. 13.3: A.7.1, A.7.2, A.7.4

ISO 27001 certification is a head start, not a finish line. The Annex is more prescriptive in places. Point 6.7.2, for example, asks for a plan to move to the latest generation network layer protocols, a plan to deploy modern e-mail security standards, and DNS and routing security practices. ENISA maps the whole of 6.7 to A.8.16 and A.8.20, which are written in general terms. Your Statement of Applicability won't show those plans unless you add them.

Which Annex points catch data centres and MSPs out?

From a line-by-line read of the Annex, these are the points we would check first at a data centre or MSP:

  • Logging scope (3.2.3). The list goes beyond servers: it includes physical access to facilities, use of network equipment and environmental events. For a data centre, that puts access control and BMS event logs in scope alongside server logs.
  • Log integrity and time (3.2.5, 3.2.6). Protected, backed-up logs, synchronised time and redundant logging. Our post on log retention requirements in India and SIEM storage sizing covers the storage maths.
  • Backups (4.2.2(c), 4.2.6). Copies off the system's network, far enough to survive a disaster at the main site, with tested restores.
  • Third-party remote access (6.7.2(d) and (h)). Service provider connections only after an authorisation request and for a set period, such as one maintenance window. Standing vendor VPN accounts are hard to square with this.
  • Admin network separation (6.8.2(f), (g)) and admin systems (11.4). A dedicated administration network, separated from production traffic, and admin workstations used for nothing else.
  • Supporting utilities (13.1.2). Protected power and telecoms cabling, utility monitoring against thresholds, and emergency supply contracts, such as generator fuel.
  • Supplier contracts (5.1.4). Eight contract terms, from incident notice to audit rights and exit (see the Indian section below).

If your facility work needs engineering help, Asset Online Pvt Ltd (AOPL) supplies and integrates data centre infrastructure and network security and cybersecurity solutions in this area.

If you are an Indian MSP or data centre serving EU clients

Indian providers meet Regulation 2024/2690 in two ways.

1. Directly, if you offer services in the EU. Under Article 26(1)(b), data centre providers, MSPs, MSSPs, cloud and CDN providers fall under the member state of their "main establishment" in the EU. That is where cybersecurity risk decisions are mostly taken, then where cyber operations run, then where most EU staff sit (Article 26(2)). If you are not established in the EU but offer services there, Article 26(3) requires you to designate a representative in one of the member states where you offer services. Without one, any member state where you provide services may take legal action against you. Scope depends on your size, services and EU footprint, so take legal advice.

2. Through your client's contract, even if you are not in scope. Article 21(2)(d) makes supply chain security a duty of your EU client. Annex point 5.1.4 says the client's contracts with suppliers should specify, where appropriate:

  • cybersecurity requirements, including those for ICT products and services (point 6.1)
  • staff awareness, skills, training and certifications
  • background checks on staff
  • notice of incidents that put the client at risk, without undue delay
  • the right to audit or to receive audit reports
  • handling of vulnerabilities that put the client at risk
  • rules on subcontracting, with the same security terms passed down
  • exit duties, such as returning and disposing of the client's information

Expect these clauses in renewals, plus access rights limited in scope and time (11.2.2(d)).

3. Run the CERT-In clock alongside. CERT-In's Directions No. 20(3)/2022 of 28 April 2022 require service providers, data centres and body corporates to report the listed incidents to CERT-In within 6 hours of noticing them (para (ii)). They must also keep logs of all ICT systems for a rolling 180 days within Indian jurisdiction (para (iv)), and sync clocks to NIC or NPL NTP servers, or to sources traceable to them (para (i)). Build one runbook with three clocks: 6 hours for CERT-In, your contractual notice to the EU client, and the client's 24-hour early warning.

Indian MSPs serving Saudi clients face another constraint. The NCA's Essential Cybersecurity Controls (ECC-2:2024) require cybersecurity managed service centres for monitoring and operations that use remote access to be fully located in Saudi Arabia (control 4.1.3.2).

How do other regions compare? Regulation by region

Region Rule Who it covers Incident clock Status on 13 Nov 2026
EU NIS2 Directive 2022/2555 plus Implementing Regulation 2024/2690 Data centres, cloud, CDN, MSP, MSSP, DNS, TLD, trust services and more 24 h early warning, 72 h notification, final report 1 month later In force; amendment proposal COM(2026) 13 pending
UK NIS Regulations 2018; Cyber Security and Resilience (Network and Information Systems) Bill Today: energy, transport, health, drinking water, digital infrastructure, some digital services. Bill adds data centres (Ofcom) and medium and large MSPs (Information Commission) Bill: initial notice within 24 h, fuller report within 72 h Still a bill. GOV.UK summary (updated 3 Nov 2026) says it comes into force in phases after Royal Assent
US CIRCIA (2022) Covered critical infrastructure entities, per CISA's rule 72 h for covered incidents, 24 h after a ransom payment Not yet required. Reporting starts only when CISA's final rule takes effect
Saudi Arabia (GCC) NCA ECC-2:2024 Government entities and private operators of critical national infrastructure Not set in ECC; 4 domains, 108 main controls, 92 subcontrols In force
India CERT-In Directions 20(3)/2022 under IT Act s.70B(6) Service providers, intermediaries, data centres, body corporates, government 6 h In force since 60 days after 28 Apr 2022

Our hub on cybersecurity compliance for infrastructure teams sets these rules side by side with DORA and the SEC rule.

Is NIS2 changing, and is every country ready?

On 20 January 2026, the Commission proposed targeted amendments to NIS2 (COM(2026) 13) as part of a cybersecurity package. The Commission says the changes simplify jurisdiction rules and would ease compliance for 28,700 companies, including 6,200 micro and small enterprises. As of 13 November 2026, the Commission's NIS2 page (last updated 2 July 2026) still describes this as a proposal. Regulation 2024/2690 is not changed by it today.

On transposition, the Commission sent reasoned opinions on 7 May 2025 to 19 member states for failing to notify full transposition. Its transposition page was last updated on 1 July 2025 and gives no current count, so we don't state one. Check the country pages linked from it before you plan audits in a given state.

Checklist: questions to ask your data centre or MSP

  1. Are you in scope of NIS2 as an essential or important entity, and which member state supervises you? If outside the EU, who is your Article 26 representative?
  2. How fast will you notify us of an incident that affects us? Does that leave us time for a 24-hour early warning?
  3. Can you show your significant incident criteria against Articles 3, 4, 8 and 10 of Regulation 2024/2690?
  4. What is the scope of your ISO 27001:2022 certificate, and how do you cover Annex points beyond it, such as 6.7.2(j) to (l)?
  5. How do you grant and expire your engineers' remote access to our systems (6.7.2(h), 11.2.2(d))?
  6. Where are backups held, how far from the main site, and when was the last restore test (4.2.2, 4.2.6)?
  7. Do your logs include physical access and environmental events, and how long do you keep them (3.2.3, 3.2.5)?
  8. Do the same security terms flow down to your subcontractors, and what happens to our data at exit (5.1.4(g), (h))?

Free download: NIS2 2024/2690 Gap Assessment (Excel)

Preview of the free NIS2 2024/2690 gap assessment spreadsheet
Free Excel tool
NIS2 2024/2690 Gap Assessment
Rate your data centre, cloud or managed service against every sub-section of the 2024/2690 Annex. Pick a status, name an owner, log your evidence and set a date. The summary sheet shows percent compliant for each of the 13 areas.
  • 53 Annex sub-sections covering all 161 numbered points
  • ISO/IEC 27001:2022 references from ENISA's mapping table v1.2
  • Significant incident triggers and the 24h/72h/1-month clock on one sheet
Download the free Excel file ↓
Excel (.xlsx) · Example row filled in · No sign-up

One row for each of the 53 Annex sub-sections, with ENISA's ISO 27001:2022 references, a status drop-down, owner, evidence and target date. A summary sheet works out percent compliant by area.

FAQs

Does Regulation 2024/2690 apply to every NIS2 entity? No. It applies to the digital providers named in Article 1, such as data centres, cloud, MSPs and MSSPs. Other NIS2 entities follow Article 21 of the Directive as transposed in national law.

Is ISO 27001 certification enough to comply with 2024/2690? No. ENISA's mapping table links each Annex sub-section to ISO controls but says it is not a measure of equivalence. You still need evidence for each Annex point, and a documented reason for any point you treat as not applicable.

What is the NIS2 significant incident threshold for financial loss? A direct loss, actual or possible, above EUR 500,000 or 5% of the previous year's total annual turnover, whichever is lower (Article 3(1)(a)).

Does scheduled maintenance count as a significant incident? No. Article 3(2) excludes scheduled interruptions and the planned effects of scheduled maintenance.

Do Indian MSPs need an EU representative under NIS2? An MSP not established in the EU that offers services in the EU must designate a representative there (Article 26(3)). Whether your firm is in scope depends on its size and services, so take legal advice.

Need help with a gap assessment, logging design or data centre controls? Talk to AOPL.