How to Choose a System Integrator for IT and OT Projects

hero background
IT Infrastructure

How to Choose a System Integrator for IT and OT Projects

Back to all blogs

Short answer: choose a system integrator in three steps. First, apply pass/fail gates: scope acceptance, OEM authorisation, contactable references, no conflict of interest, and acceptance of your security clauses. Second, score the survivors on weighted technical criteria such as experience, design, named team, OEM support and local presence. Third, combine the technical score with a 5-year cost score. India's Ministry of Finance uses this quality-and-cost method for services, with a default 70:30 weight. A free Excel scorecard is below.

Free Excel tool System Integrator Evaluation Scorecard comes free with this guide. Download now ↓

This guide covers what a system integrator does, how to set evaluation criteria, how to weigh quality against cost, and the due diligence checks Indian regulators expect.

What does a system integrator do?

A system integrator (SI) designs, supplies, installs and connects products from several makers so they work as one system. For IT and OT projects that typically means:

Project type What the SI pulls together
Enterprise network Switches, firewalls, Wi-Fi, cabling, network management
Data centre or server room Racks, servers, storage, UPS, cooling, monitoring
Building management (BMS/IBMS) Controllers, field devices, HVAC, fire, access, CCTV integration
RFID and asset tracking Tags, readers, middleware, ERP integration
Plant IT/OT PLC and SCADA connectivity, IoT gateways, historians, dashboards

The SI is accountable for the whole result. That's the value, and also the risk: if you pick the wrong one, problems surface only at commissioning, when changing partners is most expensive.

Why do SI selections go wrong?

  • Lowest price wins by default. The cheapest quote often hides exclusions, thin staffing or weaker products.
  • Criteria set after bids arrive. Scores bend to a favourite.
  • References not called. A list of logos is not a reference.
  • Capex only. AMC, licences and spares over five years can change the ranking.
  • No named team. The sales team is strong; the delivery team is unknown.

How do you set up the evaluation?

India's Ministry of Finance describes Quality and Cost Based Selection (QCBS) for consultancy and services procurement. Its 2025 manual sets out the method (Ministry of Finance, Department of Expenditure, Manual for Procurement of Consultancy Services, 2nd edition, 2025):

Diagram of six QCBS steps: gates, technical score, minimum mark of 70 to 80, cost score with lowest price at 100, 70:30 weighting, and ranking with H-1 recommended
From the Ministry of Finance's Manual for Procurement of Consultancy Services (2025).
  • Technical proposals are scored against stated criteria. A minimum qualifying mark, normally 70 to 80 out of 100, decides who goes forward.
  • Only qualified bids are price-compared. The lowest gets a cost score of 100, and others are pro-rated.
  • The technical and cost scores are weighted and added. Any split other than 70:30 should be examined and justified.
  • The highest combined score ranks H-1.

The manual also warns against overly tight qualification. It notes that some buyers set minimum turnover at 5 to 10 times the contract value, which "prima facie, appears high" and reduces competition.

Private companies don't have to follow government rules, but the method is sound and easy to defend to auditors and boards.

Which criteria should you score?

Criterion Suggested weight What to look for
Similar project experience 20% Same scale, sector and mix of IT and OT, completed in the last 5 years
Technical approach and design 20% Answers each requirement; lists assumptions and risks
Named project team 15% Project manager and leads with CVs; OEM certifications
OEM relationships 10% Partner level, direct escalation, spares stocked in India
Security and compliance 10% Named security lead; incident process fits your obligations
Local support 10% Engineers near your sites; response times you can verify
Documentation and handover 10% Test plans, as-builts, configurations, training
Financial stability 5% Turnover and cash flow relative to your contract

Adjust the weights to the project. A plant OT project might give more weight to safety and OT experience; a multi-site rollout might weigh local support higher.

What due diligence should you do on an SI?

For banks and other RBI-regulated entities, due diligence is a rule. The RBI's Master Direction on Outsourcing of IT Services (10 April 2023) says due diligence should take a risk-based approach and cover qualitative, quantitative, financial, operational, legal and reputational factors (RBI Master Direction, 10 April 2023). The checklist it gives is useful for any buyer:

  • past experience and demonstrated competence for the work
  • financial soundness, even under adverse conditions
  • reputation, complaints and pending litigation
  • conflicts of interest
  • technology, security, internal controls and audit coverage
  • business continuity and disaster recovery
  • due diligence on the SI's own employees and sub-contractors
  • concentration risk if one provider does too much

CERT-In's 15 Elemental Cyber Defense Controls for MSMEs (September 2025) add two third-party controls: do due diligence on each vendor based on business impact, and hold third parties to the same security standards you apply internally (CERT-In, Elemental Cyber Defense Controls for MSMEs).

If the SI will handle personal data (CCTV footage, access logs, employee records), remember that under section 8(1) of the DPDP Act, 2023, the data fiduciary stays responsible for processing done on its behalf (DPDP Act, 2023). Put the security obligations in the contract.

How do you run the evaluation in practice?

  1. Form a small committee. Include IT or OT, the site or facility head, finance and procurement. One person can't judge design, cost and contract risk alone.
  2. Fix the criteria and weights before issuing the RFP. Publish them in the RFP so bidders know what matters.
  3. Hold a pre-bid meeting and a site visit. Most scope gaps show up here, not after award.
  4. Score independently, then moderate. Each member scores alone first. The Ministry of Finance manual asks buyers to have a system for moderating widely different marks between members.
  5. Ask for presentations from shortlisted bidders, with the named delivery team. Ask the project manager, not the sales lead, to explain the plan.
  6. Record the reasons. A short note per criterion per bidder protects the decision if it's questioned later.

Rushing this stage usually costs more time later, at commissioning.

How should you weigh quality against cost?

The 70:30 default works well for most integration projects, where a poor design costs far more than the price gap between bidders. Consider moving towards 80:20 for complex, high-risk projects (live plant systems, data centres), and towards 60:40 for repeat, well-defined work like a cabling refresh.

Three rules make the cost side fair:

  1. Use a 5-year total cost. Supply, installation, licences, AMC and spares.
  2. Normalise scope. Make every bidder price the same bill of quantities, and list exclusions separately.
  3. Open prices only after technical scoring is final. That keeps scores honest.

Free download: System Integrator Evaluation Scorecard (Excel)

Preview of the free system integrator evaluation scorecard in Excel
Free Excel tool
System Integrator Evaluation Scorecard
Compare up to three bidders with pass/fail gates, weighted technical scores and a QCBS-style quality and cost ranking.
  • Six mandatory gates with automatic pass/fail
  • Eight weighted technical criteria with scoring guide
  • Quality-cost combined score and H-1 ranking
Download the free Excel file ↓
Excel (.xlsx) · Example placeholders filled in · No sign-up

Questions to ask in SI reference calls

  • Was the project delivered on time and on budget? If not, why?
  • Was the team that delivered the same one that was proposed?
  • How did the SI handle a problem that wasn't their fault?
  • How quickly do they respond to support calls today?
  • Did you get full documentation and passwords at handover?
  • Would you hire them again for the same work?

Red flags during selection

  • No named project manager until after award.
  • Heavy dependence on sub-contractors that aren't disclosed.
  • Large exclusions buried in the commercial terms.
  • Reluctance to sign your security, data protection or incident-reporting clauses.
  • References that turn out to be resale-only orders, not integration projects.

For related reading, see our managed IT services vs in-house IT guide and our IT infrastructure services and AMC costs.

FAQs

What is a system integrator? A firm that designs, supplies, installs and connects products from several makers so they work as one system, and takes responsibility for the result.

How do you evaluate a system integrator? Apply pass/fail gates, score technical criteria with set weights, then combine the technical and cost scores. The Ministry of Finance's QCBS method uses 70:30 by default.

What is QCBS? Quality and Cost Based Selection: bids must reach a minimum technical score, then technical and cost scores are weighted and added to rank bidders.

Should I always pick the lowest bid? No. Compare 5-year total cost among technically qualified bidders, and weight quality, especially on complex projects.

What should be in an SI contract? Scope, SLAs, acceptance tests, documentation, warranty and AMC terms, security and data protection clauses, incident reporting, and exit support.

Need an integrator for an IT, OT or building systems project? See our IT infrastructure services, or talk to us.